IFB 23-051-2230 Northwest River WTP UV Disinfectio...

Agency: State Government of Virginia
State: Virginia
Level of Government: State & Local
Category:
  • B - Special Studies and Analyses - Not R&D
Opps ID: NBD14089654738365389
Posted Date: Jul 7, 2023
Due Date: Jul 21, 2023
Solicitation No: IFB 18203-3
Source: Members Only
Views: Current Version ( 6 ) All Versions ( 662 )
Details


IFB-18203


  • IFB 23-051-2230 Northwest River WTP UV Disinfection Facility
    i
  • Round:3
  • Status: Open
  • Time Left:13 days, 16 hours
  • Closing:7/21/23 1:00 PM
  • Issued:6/5/23 11:34 AM
  • Last Updated:7/7/23
  • Buyer:Suzan Sadler

  • ssadler@cityofchesapeake.net
  • 757-382-6376



IFB-18203


  • IFB 23-051-2230 Northwest River WTP UV Disinfection Facility
    i
  • Round:3
  • Status: Open
  • Time Left:13 days, 16 hours
  • Closing:7/21/23 1:00 PM
  • Issued:6/5/23 11:34 AM
  • Last Updated:7/7/23
  • Buyer:Suzan Sadler

  • ssadler@cityofchesapeake.net
  • 757-382-6376

Actions
Solicitation only accepts paper responses.
  • Issued By:City of Chesapeake
  • Opportunity Type:Invitation for Bids (IFB)
  • Category:Construction
  • Work Location:Chesapeake, VA
  • Website:
  • Pre-Bid Conference:See solicitation documents for mandatory prebid/proposal conference/site visit.
  • Open Responses:See solicitation documents Public Opening information.
  • Summary:The Work under this project consists of:
    1.        Demolition of the two existing southern spent cleaning solution tanks and associated support pad and portions of the existing spent cleaning solution containment walls and the tank base slab to permit installation of a new drain pipe and electrical conduits from the new UV Disinfection Building to the existing Membrane/Chemical Building basement.
    2.        Construction of new concrete walls to enclose the containment area serving the two remaining north spent cleaning solution tanks.
    3.        Installation of a new UV Disinfection Building including restoration of the existing base slab and a new foundation wall followed by installation of the new prefabricated UV Disinfection Building.
    4.        Installation of two new UV disinfection reactors and associated stainless steel piping, false floor grating system, HVAC equipment and lighting within the new UV Disinfection Building.
    5.        Installation of new electrical power/control panels for the new UV reactors in the Membrane/Chemical Building existing electrical room and additional UV control panels in the new UV Disinfection Building.
    6.        Installation of new elevated outdoor UV influent and effluent piping and associated pipe supports between the new UV Disinfection Building and the modified existing Finished Water Chemical Addition Structure. Prior to starting the modifications described above, reroute the existing water quality sample and drain lines to a Contractor furnished portable enclosure and connect to the new instruments installed in the enclosure and connected to the existing plant control system .
    7.        Once the new portable enclosure and water quality instruments are operational and approval is given by the City, modifications requiring a plant shutdown can begin within the Finished Water Chemical Addition structure.
    8.        Following completion of the plant shutdown, the new water quality instruments and associated sample lines shall be relocated to their permanent location within the Finished Water Chemical Addition Structure (one instrument at a time within 1 hour each) and the temporary enclosure shall be removed from the site.
    Startup and testing of the new UV reactors shall be completed once finished water can be passed through them.
  • Round Information:Addendum #3 with 2 attachments: attachment#1- UV System and attachment#2 -modified drawings

Documents
Document Size Description Posted On Type
ADDENDUM No. 2_IFB 23-051-2230_NWR WTP UV Disinfection Facility.pdf (24.74 KB) Addendum #2 7/6/23 RFx Document
Attachment #1_Addendum No. 3_44_44_73_UV_System.pdf (263.05 KB) Addendum #3 7/7/23 RFx Document
Chesapeake NWR UV WTP Disinfection Facility_100% Specifications_06022023.pdf (1.79 MB) Bid documents and specifications, drawings 6/5/23 RFx Document
ADDENDUM No. 1_IFB 23-051-2230_NWR WTP UV Disinfection Facility W Attachments.pdf (3.21 MB) Addendum #1 6/29/23 RFx Document
Attachment #2_Addendum No. 3_Modified Drawings.pdf (2.98 MB) Addendum #3 7/7/23 RFx Document
Chesapeake NWR UV WTP Disinfection Facility_100% Drawings_04192023.pdf (27.14 MB) Bid documents and specifications, drawings 6/5/23 RFx Document
ADDENDUM #3_IFB 23-051-2230_NWR WTP UV Disinfection Facility-for publishing.pdf (823.72 KB) Addendum #3 7/7/23 RFx Document
Follow B2B ActivityUnfollow B2B ActivityAdd B2B Posting
  • Marine Flow and Drain is a rising welding and fabrication company with over a decade of steel and pipe fitting experince, we would love to asssit in any of the pipe work involved in this project.
  • Andre of Marine Flow and Drain LLC
  • marineflowanddrain@gmail.com
  • 757-646-9044
  • 6/6/23 10:21 AM
  • Grid 1 - Response
    • I1_1. Total base bid
    • NIGP Code:
    • Quantity: 1.00000 lump sum
    • Delivery Date:

    B2B Follow ×
    Enter Email Address:
    CloseSubmit
    B2B Unfollow ×
    Enter Email Address:
    CloseSubmit
    Add B2B Posting ×
    Contact Name:
    Company Name:
    Email Address:
    Phone Number:
    SWaM Certifications:

    Micro Business

    Small Business

    Minority Owned Business

    Women Owned Business

    Service Disabled Veteran Owned

    Employment Service Org
    Message:
    CloseSubmit

    TRY FOR FREE

    Not a USAOPPS Member Yet?

    Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

    Start Free Trial Today >