The San Jacinto River Authority is requesting Competitive Sealed Proposals (CSP) for the following project in Montgomery County, Conroe, Texas: CSP No. 23-0018-A – Process Water Recovery Basins Lining Improvements (GRP Division).
SCOPE OF SERVICES:
Located at the Lake Conroe Dam, the SJRA Groundwater Reduction Plan (GRP) Division provides surface water treatment and transmission services to program participants including multiple cities and utilities within Montgomery County. Process Water Recovery Basins Lining Improvements, hereafter called “Project” is located within the GRP surface water treatment plant at the east end of the Lake Conroe Dam.
The project consists of the removal of the existing cement soil liner of the process water recovery basins and replacement with either a cast-in-place concrete or dry-mix shotcrete lining. The work of this Contract is based upon an identified need to replace the failing liner.
Engineer's opinion of probable construction cost: $1,907,000.
Estimated project schedule: Substantial Completion within 180 calendar days after NTP. Final Completion 30 calendar days of the date required for Subtantial Completion.
Please login to download the bid documents. For the bid schedule, please view the CSP 23-0018-A.