Bid Solicitation: BD-23-1623-HRVD1-HRVD2-99795
|
Header Information
|
Bid Number:
|
BD-23-1623-HRVD1-HRVD2-99795
|
Description:
|
Water Main Interconnection Project
|
Bid Opening Date:
|
04/11/2024 02:00:00 PM
|
Purchaser:
|
Marie Sobalvarro
|
Organization:
|
Town of Harvard
|
Department:
|
HRVD1 - Town of Harvard
|
Location:
|
HRVD2 - Town of Harvard
|
Fiscal Year:
|
23
|
Type Code:
|
NS
|
Allow Electronic Quote:
|
No
|
Alternate Id:
|
|
Required Date:
|
03/13/2024
|
Available Date
:
|
03/13/2024 03:00:00 PM
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
Non-mandatory pre-bid conference held at the end of Depot Road on April 2, 2024 at 10:30 a.m.
|
Bulletin Desc:
|
Installation of 8,800 LF of 12-inch ductile iron water main on Depot Road from the intersection at Ayer Road, across the railroad tracks at the end of Depot Road and through the Red Tail Golf Course in Devens, MA to an interconnection at Marne Road. The work includes multiple culvert crossings as well as pipe jacking under an existing railroad. Work will also include installation of new hydrants, service corporations, water services, and appurtenances and roadway restoration.
|
|
Ship-to Address:
|
Marie Sobalvarro
13 Ayer Road
Harvard, MA 01451
US
Email: msobalvarro@harvard.ma.us
Phone: (978)456-4100 Ext. 330
FAX: (978)456-4107
|
Bill-to Address:
|
Marie Sobalvarro
13 Ayer Road
Harvard, MA 01451
US
Email: msobalvarro@harvard.ma.us
Phone: (978)456-4100 Ext. 330
FAX: (978)456-4107
|
Print Format:
|
Bid Print
|
File Attachments:
|
Advertisement Water Main Interconnection Project
|
Form Attachments:
|
|
Required Quote Attachments
|
|
Amendments:
|
Amendment #
|
Amendment Date
|
Amendment Note
|
1
|
03/13/2024 02:55:09 PM
|
Header 1. Description changed from "Sheridan Road Booster Pump Station" to "Water Main Interconnection Project".
|
|
|
Item # 1:
(
47-10
-
00
)
|
Installation of 8,800 LF of 12-inch ductile iron water main on Depot Road from the intersection at Ayer Road, across the railroad tracks at the end of Depot Road and through the Red Tail Golf Course in Devens, MA to an interconnection at Marne Road. The work includes multiple culvert crossings as well as pipe jacking under an existing railroad. Work will also include installation of new hydrants, service corporations, water services, and appurtenances and roadway restoration.
|
|
U N S P S C Code:
|
47-10-00
Water and wastewater treatment supply and disposal
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
10.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|