Overview: Remove and replace HVAC system at materials lab. This includes removal and replacement of current hanging furnace unit and outside AC Unit. Lennox ML196UH070XE48D gas furnace 96% AFUE and Lennox 12ACXN-042 condensing unit 13 SEER or equal.
Estimated project start date: December 27, 2022 or as coordinated upon notice to proceed
Estimated Completion date: February 17, 2023
Contractor to be a licensed HVAC in Iowa.
Until the contract is awarded the sole point of contact for this project is Tiffany Stupp (see bid contact information) any and all questions related to this project are to be submitted to Tiffany Stupp through the IONwave Bid system. (See the cut off period for questions).
Site visit:
There is no formal pre-bid meeting scheduled at this time. Interested bidders may schedule a site visit by emailing Tiffany Stupp with a requested date and time via email at
tiffany.stupp@iowadot.us.
Any questions that arise during your site visit should be submitted using the Ion Wave system.
Training:
Training on the new equipment to be included once the equipment has been installed.
Contract Award:
It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule.