Title: Eastlake Sanitary Landfill Phase 1 Cell Construction
Description:
-
Mobilization and Demobilization.
-
Strip existing vegetation located within the entire work area within project limits and add soil, where appropriate, to depression areas.
-
Subgrade excavation and grading.
-
Placement of 60 mil Linear High Density Poly Ethylene (HDPE) geomembrane on prepared subgrade layer.
-
Placement of geosynthetic clay liner (GCL) on top of 60 mil HDPE geomembrane.
-
Placement of 60 mil HDPE geomembrane on prepared GCL layer.
-
Install Leachate Collection and Control System (LCRS)
-
Placement of perforated gravel and piping drain
-
Placement of gravel sump
-
Placement of side slope riser piping
-
Placement of 24-inch thick protective soil layer over LCRS
-
Construct perimeter roads and access roads with storm drain system and mechanically stabilized earth retaining wall, depending on location.
-
Grading for surface water drainage control ditches, berm, and other control features as shown on the Drawings.
-
Placement of leachate collection and transport piping including couplings, elbows, and connections to 5000-gallon double wall tank.
-
Placement of leachate pump with sled mount.
-
Placement of 5000-gallon double wall tank.
|