Westlake Park Irrigation Pump Station Component Replacement

Agency: City of Grand Junction
State: Colorado
Level of Government: State & Local
Category:
  • 43 - Pumps and Compressors
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD15349607014906306
Posted Date: Oct 2, 2023
Due Date: Oct 19, 2023
Source: Members Only

Westlake Park Irrigation Pump Station Component Replacement

IFB-5305-23-DD
Responses Due October 19, 2023, prior to 3:00 P.M.


Attachment Preview

Purchasing Division
Invitation for Bid
IFB-5305-23-DD
Westlake Park Irrigation Pump Station Component Replacement
Responses Due:
October 19, 2023, Prior to 3:00 PM
Accepting Electronic Responses Only
Responses Only Submitted Through the Rocky Mountain E-Purchasing
System (RMEPS)
www.bidnetdirect.com/colorado
(Purchasing Representative does not have access or control of the vendor side of
RMEPS. If website or other problems arise during response submission, vendor MUST
contact RMEPS to resolve the issue prior to the response deadline. 800-835-4603)
NOTE: All City solicitation openings will continue to be held virtually.
Purchasing Representative:
Dolly Daniels, Senior Buyer
dollyd@gjcity.org
970-256-4048
1
Invitation for Bids
Table of Contents
Section 1
Section 2
Section 3
Section 4
Instruction to Bidders
General Contract Conditions
Statement of Work
Contractor’s Bid Form
Price Proposal/Bid Schedule Form
2
1. Instructions to Bidders
NOTE: It is the Contractor’s responsibility to read and review all solicitation
documentation in its entirety, and to ensure that it has a clear and complete
understanding of not only the scope, specifications, project requirements, etc., but also
all other requirements, instructions, rules, regulations, laws, conditions, statements,
procurement policies, etc. that are associated with the solicitation process and
project/services being solicited.
1.1 Issuing Office: This Invitation for Bid (IFB) is issued by the City of Grand Junction. All
contact regarding this IFB is to be directed to:
Dolly Daniels; Senior Buyer
dollyd@gjcity.org
With the exception of Pre-Bid or Site Visit Meeting(s) all questions, inquiries, comments,
or communication pertaining to this solicitation (whether process, specifications, scope,
etc.) must be directed (in writing) to the Purchasing Agent. Other communication may
result in disqualification.
1.2 Non-Mandatory (Optional) Pre-Bid Meeting: Prospective bidders are encouraged
to attend a non-mandatory pre-bid meeting on October 10, 2023, at 3:00 PM.
Meeting location shall be Westlake Park, 325 W. Orchard, Grand Junction CO 81501.
The purpose of this visit will be to clarify the contents of this Invitation for Bids (IFB).
1.3 Purpose: The City of Grand Junction is soliciting competitive bids from qualified and
interested Contractors for all labor, equipment, and materials required to install
replacement components in the irrigation pump station at Westlake Park for the purposes
of watering grass and native vegetation. All dimensions and scope of work should be
verified by Contractors prior to submission of bids.
1.4 The Owner: The Owner is the City of Grand Junction, Colorado and is referred to
throughout this Solicitation. The term Owner means the Owner or its authorized
representative.
1.5 Compliance: All Bidders, by submitting a bid, agree to comply with all conditions,
requirements, and instruction of this IFB as stated or implied herein. Should the Owner
omit anything which is necessary to clear understanding of the requirements, or should it
appear that various instructions are in conflict, the Bidder(s) shall secure instructions from
the Purchasing Agent prior to submittal deadline.
1.6 Procurement Process: The most current version of the City of Grand Junction Purchasing
Policy and Procedure Manual is contacting.
1.7 Submission: Each proposal shall be submitted in electronic format only, and only
through the Rocky Mountain E-Purchasing website.
(wwwbidnetdirect.com/colorado). This site offers both “free” and “paying”
registration options that allow for full access of the Owner’s documents and for
3
electronic submission of proposals. (Note: “free” registration may take up to 24 hours
to process. Please Plan accordingly.) Please view our “Electronic Vendor Registration
Guide” at https://co-grandjunction.civicplus.com/501/Purchasing-Bids for details.
(Purchasing Representative does not have access or control of the vendor side of
RMEPS. If the website or other problems arise during response submission, the vendor
MUST contact RMEPS to resolve the issue prior to the response deadline 800-835-4603).
Westlake Park Irrigation Pump Station Component Replacement IFB-5305-23-DD
Oct 19, 2023, 3:00 – 3:30 PM (America/Denver)
Please join my meeting from your computer, tablet or smartphone.
https://meet.goto.com/802689533
You can also dial in using your phone.
Access Code:
802-689-533
United States:
+1 (312) 757-3121
Join from a video-conferencing room or system.
Meeting ID:
802-689-533
Dial in or type:
67.217.95.2 or inroomlink.goto.com
Or dial directly:
802689533@67.217.95.2 or 67.217.95.2##802689533
Get the app now and be ready when your first meeting starts:
https://meet.goto.com/install
1.8 Modification and Withdrawal of Bids Before Opening Bids may be modified or
withdrawn by an appropriate document stating such, duly executed and submitted to the
place where Bids are to be submitted at any time prior to Bid Opening.
1.9 Form for Price Bid: All Price Bids must be made upon the Price Bid Schedule attached
and should give the amounts both in words and in figures and must be signed and
acknowledged by the Bidder.
The Bidder shall specify a unit price in figures for each pay item for which a quantity is given
and shall provide the products (in numbers) of the respective unit prices and quantities in
the Extended Amount column. The total Bid price shall be equal to the sum of all extended
amount prices. When an item in the Price Bid Schedule provides a choice to be made by
the Bidder, Bidder's choice shall be indicated in accordance with the specifications for that
particular item and thereafter no further choice shall be permitted.
Where the unit of a pay item is lump sum, the lump sum amount shall be shown in the
"extended amount" column and included in the summation of the total Bid.
All blank spaces in the Price Bid Schedule must be properly filled out.
Bids by corporations must be executed in the corporate name by the president or vice
president or other corporate office accompanied by evidence of authority to sign. The
corporate address and state of incorporation shall be shown below the signature.
4
Bids by partnerships must be executed in the partnership name and signed by a partner
whose title must appear under the signature and the official address of the partnership must
be shown below the signature.
All names must be typed or printed below the signature.
The Bidder’s Bid shall contain an acknowledgement of receipt of all Addenda, the numbers
of which shall be filled in on the Contractor’s Bid Form.
The contact information to which communications regarding the Bid are to be directed must
be shown.
1.10 Exclusions: No oral, telephonic, emailed, or facsimile bid will be considered.
1.11 Contract Documents: The complete IFB and Bidder’s response compose the Contract
Documents. Copies of bid documents can be obtained from the City Purchasing website,
https://co-grandjunction.civicplus.com/501/Purchasing-Bids .
1.12 Additional Documents: The July 2010 edition of the “City Standard Contract Documents
for Capital Improvements Construction”, Plans, Specifications and other Bid Documents
are available for review or download on the Purchasing Bids page at https://co-
grandjunction.civicplus.com/501/Purchasing-Bids.
1.13 Definitions and Terms: See Article I, Section 3 of the General Contract Conditions in
the Standard Contract Documents for Capital Improvements Construction.
1.14 Examination of Specifications: Bidders shall thoroughly examine and be familiar with
the project Statement of Work. The failure or omission of any Bidder to receive or
examine any form, addendum, or other document shall in no way relieve any Bidder from
any obligation with respect to its bid. The submission of a bid shall be taken as evidence
of compliance with this section. Prior to submitting a bid, each Bidder shall, at a minimum:
a. Examine the Contract Documents thoroughly.
b. Visit the site to familiarize itself with local conditions that may in any manner affect
cost, progress, or performance of the Work;
c. Study and carefully correlate Bidder's observations with the Contract Documents,
and;
d. Notify the Purchasing Agent of all conflicts, errors, ambiguities, or discrepancies
in or among the Contract Documents within the designated inquiry period.
On request, the Owner will provide each Bidder access to the site to conduct
such investigations and tests as each Bidder deems necessary for submission
of a Bid. It shall be the Bidder’s responsibility to make or obtain any additional
examinations, investigations, explorations, tests and studies and obtain any
additional information and data which pertain to the physical conditions
(including without limitation, surface, subsurface and underground utilities) at
or contiguous to the site or otherwise which may affect cost, progress or
performance of the Work and which the Bidder deems necessary to determine
5
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >