LED Conversion - CVM Main Building Phase 1
Agency: | North Carolina State University |
---|---|
State: | North Carolina |
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD15500249084893584 |
Posted Date: | Mar 27, 2024 |
Due Date: | Apr 10, 2024 |
Source: | Members Only |
Institution | NC State University | |||
Institution URL for Additional
Information about this Project (Optional) |
https://facilities.ofa.ncsu.edu/2024/03/lighting-conversion-cvm-main-building-phase-1/ | |||
Project Name | LED Conversion - CVM Main Building Phase 1 | |||
Prequalifying for |
Within the CVM Main building, this project will convert the existing lighting to LED for energy savings. Existing fixtures will either be retrofitted or replaced. Approximately 43,650 square feet of the building will be included with this phase of the project. This square footage consists primarily of hallways and stairwells. Parts of the building may be occupied during construction, and some night/weekend work may be necessary.
|
|||
Main Contact for Submission | Campus Contact | |||
Name of Design Firm | SKA Consulting Engineers | |||
Design Firm Contact Name | Kenzie Oakes | |||
Design Firm Telephone Number | ||||
Design Firm Email | KMOakes@skaeng.com | |||
CM at Risk Firm Name | ||||
CM at Risk Firm Email | jlpfeif2@ncsu.edu | |||
Campus Contact Email | jlpfeif2@ncsu.edu | |||
Due Date | 04/10/2024 | |||
Due Time | 5:00 pm | |||
Submit To |
DC_Formal_Prequal@ncsu.edu (electronic format only)
|
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.