John B. Alexander High School Main Gym Roof Restoration Addendum 1
Agency: | United Independent School District |
---|---|
State: | Texas |
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD15602128828881132 |
Posted Date: | Mar 19, 2024 |
Due Date: | Mar 27, 2024 |
Solicitation No: | JOC 001-2024 |
Source: | Members Only |
Bid Information
|
Contact Information
|
Bid Documents
Bid Attachments
File Name | Description | File Size | ||||
| ||||||
JOC 001-2024 Boiler plate.pdf |
Boiler Plate | 295 KB | ||||
JOC 001-AHS-Site Plan Gym Roof Repair rev 3 4 24-Site Plan (1).pdf |
Plans | 519 KB | ||||
JOC 001-2024.xlsx |
Excel Spreadsheet | 12 KB | ||||
JOC 001-2024 ADDENDUM 1 (1).pdf |
JOC 001-2024 ADDENDUM 1
|
105 KB |
Bid Questions
| ||||||||
| ||||||||
| ||||||||
|
|
Event Invitations
Supplier Name | City | State | Contact | ||||
| |||||||
American Contracting & Roofing | Laredo | TX | |||||
Leyendecker Construction of Texas, Inc. | Laredo | TX | |||||
Midas Contractors LLC | Laredo | TX | Nelso Molina | ||||
Quantum Construction | Laredo | TX | |||||
Summit Building & Design | Laredo | TX | |||||
Zertuche Construction & Management Services | Laredo | TX | Ramon Zertuche II |
Attachment Preview
ADDENDUM
DATE: March 19, 2024
ADDENDUM NO. 01
PROJECT:
JOC 001-2024 John B. Alexander High School Main Gym Roof Restoration
The work described herein shall be added to the scope of work defined by the contract documents or it
shall modify the scope of work defined by the contract documents as described. This work shall become
a part of the contract documents by addendum.
REVISED SCOPE OF WORK
ITEM 01
SCOPE OF WORK
A. Job Order Contract Terms and Scope of Work Page 3
I. Revised Line Item # 1.24.0 to read as follows:
1.24.0 Install a new sheet metal L bracket between facia and wall at all
eave locations for the main gym and securely fasten to the wall.
All gaps between facia and wall must be sealed properly.
ITEM 02
CLARIFICATION
A. Regarding line item 1.14.0 under SCOPE OF WORK, a comment was brought up from
an interested bidding party during the pre-bid meeting stating that the gutter gauge
would need to be upgraded from 24 gauge to 22 gauge in order for the manufacture
to honor the 15 year warranty.
- The gauge metal for the gutter does not affect the manufactures 15 warranty.
The gutter gauge of 24 will be the acceptable minimum gutter gauge as per line
item 1.14.0
END OF ADDENDUM
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation.
For more information, please visit the Publication URL Web page.
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.