Buffalo Creek Floodplain Reconnection Final Design and Permitting

Agency: The New York State Contract Reporter
State: New York
Level of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD15621052532550581
Posted Date: Mar 22, 2024
Due Date: Apr 12, 2024
Source: Members Only
Issue Date: 03/22/2024 Contract Number: TBD
Buffalo Creek Floodplain Reconnection Final Design and Permitting
Description:

The purpose of this Project is to utilize innovative, nature-based solutions to combat flooding impacts on the Lexington Green neighborhood by reconnecting Buffalo Creek to its historic floodplain. By looking to naturalize shorelines and create living systems the project will increase the capacity of the creek system to mitigate current flooding issues and handle changes in water volumes that is expected to occur in our region as a result of climate change. All work performed for BNW must be accomplished with the protection of water resources and the environment in mind.


The goal of the Project is to design a floodplain bench (or series of floodplain benches) and associated riparian areas to allow for unobstructed stream inundation during periods of high flow.

Due Date: 04/12/2024 2:00 PM

Contract Term: 1 year

Location:

Ad Type: General

Primary Contact: Buffalo Niagara Waterkeeper
Administration

Kelly Mayer
Director of Finance and Operations
721 Main Street
Buffalo, NY 14203
United States
Ph: 716-852-7483
Fax:
kmayer@bnwaterkeeper.org
Secondary contact: Buffalo Niagara Waterkeeper
Administration

Kelly Mayer
Director of Finance and Operations
721 Main Street
Buffalo, NY 14203
United States
Ph: 716-852-7483
Fax:
kmayer@bnwaterkeeper.org

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >