Geotechnical Manual

Agency: State Government of Montana
State: Montana
Level of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
Opps ID: NBD15688949356815916
Posted Date: Mar 20, 2024
Due Date: Apr 17, 2024
Solicitation No: Geotechnical
Source: Members Only
Title Closes
Geotechnical Manual 04/17/2024

Attachment Preview

Montana Department of Transportation
2701 Prospect
PO Box 201001
Helena MT 59620-1001
Greg Gianforte, Governor
Malcolm “Mack” Long, Director
Date:
March 20, 2024
Subject:
Request for Proposals
Geotechnical Manual
UPN 50605
To Whom It May Concern:
The Montana Department of Transportation (MDT) is accepting proposals from consulting firms
interested in authoring and updating MDT Geotechnical Manual. One firm will be selected to
perform the work specified herein.
Teams may be established as necessary; however, it is expected that the prime consultant will be
capable of completing the vast majority of the work, and the proposal must clearly identify the
prime for this contract. As a rule, the prime consultant must complete at least 50% of the work
for a specific project or assignment unless written exception is given.
Montana professional engineering licensure is required for this work and must be in-hand at the
time your proposal is submitted. If this requirement is not met and clearly identified in the
proposal, your proposal will be considered non-responsive.
If your firm is interested, please submit a proposal as described herein.
SCOPE OF WORK
The Department has many manuals encompassing design process, administration and procedures
requiring updating. The department has an existing geotechnical manual that was completed in
2008. This manual is available on the department website in pdf format and Microsoft word files
can be made available. The manual needs to be updated for newer or innovative geotechnical
engineering content, updated state of practice, as well as MDT procedures, organizational
structure, administrative procedures, etc. Updates to the geotechnical manual will also need to
consider the reorganization of the geotechnical bureau which now includes the pavement
analyses group. Updates to the geotechnical manual will need to be harmonious with the
pavement design manual.
The existing geotechnical manual should be used as a starting point and each chapter will need to
be reviewed and updated as appropriate. All chapters will need to be updated to some level of
effort and the required effort for each chapter will differ based upon content and changes in both
MDT and national practice since the time of the original manual development. An additional
new chapter for geotechnical asset management will also need to be developed. Other new
chapters may also be required.
The consultant will update the manual utilizing the existing Department organization, manuals
and standards as a guideline to determine the content of the updates. Manuals provided by other
Departments of Transportation, FHWA and AASHTO may also be used as guides.
The consultant will submit individual chapters upon completion for review by appropriate
Department personnel. Each revision and final draft will also be circulated for review. The text
will be submitted in Microsoft Word and Excel format for tables, diagrams, etc. The consultant
is responsible for all diagrams, figures and details. The Manuals will be prepared in a fully
hyperlinked HTML format ready for electronic posting.
LOCATION
Project work will be statewide.
PROJECT SCHEDULE AND DELIVERABLES
The project schedule will be developed and negotiated prior to executing the contract agreement.
At this time, it is anticipated that deliverables will generally follow those described in MDT’s
Consultant Activity Descriptions (as applicable):
http://www.mdt.mt.gov/other/webdata/external/cdb/ACTIVITY_DESCRIPTIONS/CONSULTA
NT_DESIGN_2500_MU.PDF
STANDARDS, SPECIFICATIONS, AND POLICIES
Work is expected to follow MDT’s various Manuals, Guides, and Policies. These items may be
found on MDT’s Design Consulting web page at: http://www.mdt.mt.gov/business/consulting/.
Page 2 of 8
PROPOSAL SUBMITTAL
Submit one (1) electronic version (Adobe© PDF format) of the proposal. Hard copy
proposals will not be accepted.
Submit the electronic version by uploading to the State of Montana File Transfer Service (FTS)
site, which can be accessed at this link: https://transfer.mt.gov. To upload to FTS, an account
must be created unless the person who is uploading already has an account. Uploading
instructions can be accessed at https://transfer.mt.gov/Home/Instructions. When your proposal
has been uploaded, the FTS system will prompt you for an email address to send to. Please send
this email of your uploaded proposal to the following individuals:
Sheryl Tangen: stangen@mt.gov
Kelly Williams: kwilliams@mt.gov
Mark Studt: mstudt@mt.gov
The Department must receive the proposals for this RFP no later than 3:00 PM MST, April
17, 2024.
Regardless of cause, late proposals will not be accepted and will automatically be disqualified
from further consideration. It shall be solely the vendor's responsibility to assure delivery at the
specified office by the specified time. Offeror may request the State return late proposals at
vendor’s expense or the State will dispose of late proposals if requested by the offeror. (See
Administrative Rules of Montana (ARM) 2.5.509.). If no request is made, late proposals become
the property of the Department. All proposals submitted on time become the property of the
Department.
The costs for developing and delivering responses to this solicitation are entirely the
responsibility of the offeror. The State is not liable for any expense incurred by the offeror in the
preparation and presentation of this submittal.
TENTATIVE RFP/SELECTION SCHEDULE
The anticipated schedule for consultant solicitation and selection for this contract is as follows
(subject to change):
March 20, 2024: RFP released
April 17, 2024:
Proposals due to be submitted to MDT Consultant Design
April 29, 2024:
Proposals reviewed, rated, and ranked by the evaluation committee
May 3, 2024:
Consultant Selection Board meeting to select consultant
May 22, 2024:
Scoping meeting with selected consultant
Page 3 of 8
There are three (3) members on the evaluation committee for this RFP (subject to change):
1. MDT Geotech & Pavement Bureau Chief
2. MDT Geotechnical Section Supervisor
3. MDT Butte District Engineering Manager
PROPOSAL CONTENTS
The proposal must contain the information listed in this section. The proposal is limited to ten
(10) pages, not including the required Appendices. A single cover jacket/title page is allowed if
desired and will not count in the page limit. Each page is defined as one side of a letter size
sheet (no larger than 8 ½” x 11”), minimum font size of 10. Evaluation of information will begin
with the first page immediately following the cover jacket/title page, and every page will be
counted, in order, from that point forward, including any table of contents or divider pages the
firm wishes to include. Once the page limit is reached, any information included thereafter will
be removed and not considered or scored. Please organize your proposal in the same order and
numbering format as shown below, which will assist MDT in reviewing your proposal:
Questions
1) Team Qualifications
Provide a discussion on how the team you propose to use for this project (including
subconsultants, if used) is best qualified to respond to the requirements of this project.
Discussion should focus on the requirements for this specific project, particularly your
team’s expertise and experience, as it relates to the work described in the “Scope of
Work” section above. Provide examples of previous related project experience as it
relates to these technical writing services. Identify professional licensure of staff that
satisfy the requirements for this contract. Include an organizational chart of your team
for this project. Also briefly discuss your compatibility of systems, software, and
equipment (i.e. CADD software, word processing software, etc.), and experience with
these systems, software, and equipment. The Department’s standard design software is
Autodesk® technology included in the Architecture, Engineering & Construction (AEC)
Collection. Describe any special equipment or software you intend to use. Resumes may
be considered as supplemental information for scoring this question.
2) Project Approach
Transportation work has many challenging aspects, and the development and delivery of
a successful project that addresses and mitigates specific project challenges is of utmost
interest to MDT. Discuss the challenges you foresee as they relate to this project and its
requirements, your strategy for addressing these challenges, and your specific experience
in implementing the strategies identified. Describe your quality assurance/quality control
process. Include a discussion on the current and projected workload of key personnel, the
effects that workload would have on your ability to successfully deliver this project, and
your overall plan for delivering this project in a timely manner.
Appendix A: Resumes
Include brief resumes for the key personnel to be assigned to the contract. Resumes are
limited to one (1) page per person.
Page 4 of 8
Appendix B: Cover Page Form
Include a completed version of MDT’s standard cover page form, available at the following
location:
http://www.mdt.mt.gov/other/webdata/external/cdb/MDT-CDB-002-Proposal-SOQ-Cover-Sheet.pdf
Information presented in the cover page form will not be considered in proposal scoring.
Appendix C: References
Submit references that includes a minimum of five (5) separate contracts from the past
three (3) years. If applicable, you may submit multiple contracts for a single client. Each
contract must pertain to work similar to the proposed scope of services. Include client
name, a currently employed primary contact person, an alternative contact person,
corresponding valid phone numbers and emails for both contacts, a range of contract value,
and a brief description of the work performed. If MDT needs to use these references for
the Past Performance Score (as described in the “Evaluation of Proposals” section below)
and is unable to contact the required number of references after a reasonable effort, the firm
will receive a zero for the missing reference(s).
EVALUATION OF PROPOSALS
All proposals will be evaluated in accordance with the following factors:
1) Team Qualifications (100 points possible)
2) Project Approach (50 points possible)
3) Record of past performance (30 points possible)
a) If two (2) or more MDT evaluations specific to the discipline for this contract are
available for the consultant, the average score of these evaluations will be used.
Evaluations for Project Management & Overall Performance will also be included.
b) If fewer than two (2) MDT evaluations specific to the discipline for this contract are
available for the consultant, but there are two (2) or more MDT evaluations are
available for other work disciplines, the consultant’s current overall past performance
score from MDT evaluations will be used.
c) If there is only one (1) MDT evaluation available for the consultant, the record of past
performance score will be an average of the MDT evaluation and one (1) reference
check from the references provided in the unbound attachment.
d) If no MDT evaluations are available, the average score of two (2) reference checks
from the references provided in the unbound attachment will be used for this score.
Regardless of partnership/teaming relationships, the past performance of the prime
consultant will be the past performance scored that will be used for this score.
All Proposals will be evaluated using the following basic scoring methodology:
o Outstanding/Exceptional response: 90-100% of the available points
o Good response: 70-90% of the available points
o Average response: 50-70% of the available points
o Poor response: 30-50% of the available points
o Qualifications not clearly met: 0-30% of the available points
Following the review, evaluation, and rating of all proposals, the final results will be presented to
the Consultant Selection Board (Board) at the MDT Headquarters Building. At this time, the
Page 5 of 8
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >