Blown Wool Insulation

Agency: Clemson University
State: South Carolina
Level of Government: State & Local
Category:
  • 83 - Textiles, Leather, Furs, Apparel and SHoes, Tents, Flags
Opps ID: NBD15748469294379280
Posted Date: Jan 23, 2024
Due Date: Feb 8, 2024
Solicitation No: 178231783-2
Source: Members Only

Bid Information



Type
SQST Sealed Bid
Status
Issued
Number
178231783-2 (Blown Wool Insulation)
Issue Date & Time
1/23/2024 05:00:01 PM (ET)
Close Date & Time
2/8/2024 03:00:00 PM (ET)
Time Left
15 days 20 hours 11 minutes 5 seconds
Notes

REBID- Clemson University seeks a supplier to provide and apply Blown Wool Insulation as outlined in the attached Specifications or Scope of Work under "Attachments" section. Quotes submitted prior to this solicitation are not a substitution for submitting your online bid. All submissions must be made online. No red lines to the contract will be accepted during the submission process. If there are terms you cannot agree to or wish to have changed you must request that by submitting a question or request for modification to the scope to the Procurement Officer during the Deadlines for Question process and Clemson will consider changes. However to ensure all offerors offer the same scope, redlines or caveats put on any proposal may make your proposal non-responsive and not able to be considered. In order to submit an offer, you must first register/login to Clemson Bidding at https://clemson.ionwave.net/VendorRegistration.aspx Registration is recommended no later than 48 hours prior to bid close. It is highly encouraged that you submit your bid prior to the closing date.

Contact Information
Name
Alexis P. Jackson
Address
391 College Avenue, Suite 203
Clemson, SC 29634
Phone
Fax
Email
apjacks@clemson.edu




Bid Documents







Document name Format


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



1 items in 1 pages

Bid Invitation (please login to view this document)

Acrobat / PDF


Bid Attachments











File Name Description File Size


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



5 items in 1 pages

Revised Scope of Work - 178231783-2.docx
Revised Scope of Work. 1.41 MB

Map of Lightsey Bridge buildings.pdf
See attached map of Lightsey Bridge buildings. 996 KB

Clemson University Standard Bidding Terms effective November 15, 2020.pdf
Standard Bidding Terms 261 KB

IMPORTANT TAX NOTICE.doc
Withholding Requirements for Payments to Nonresidents. 29 KB

Clemson University Standard Terms of Purchase effective November 15, 2020.pdf
Standard Terms of Purchase 331 KB


Attachment Preview

Test Title

Scope of Work

I. Scope of Solicitation

II. Instructions to Offerors

III. Scope of Work / Specifications

IV. Terms and Conditions - Special

See updates to this Scope of Work. Changes are highlighted in GREEN for ease of identification.

I. Scope of Solicitation

This is a one-time bid for insulation to be installed in the attics of all 20 Lightsey Bridge apartment buildings over Winter Break from December 16, 2023, to January 5, 2024. before March 1, 2024. Work must be completed by May 1st, 2024.

II. Instructions To Offerors

Regardless of specific requirements below or in this document, Offerors are required to submit their proposal electronically through the Clemson University online bidding system. To do so, you must log in (registering first) at https://clemson.ionwave.net/Login.aspx, and follow specific instructions for this solicitation. You should register several days in advance of the bid closing date so you can be approved and login in time to submit a response.

1. The successful Offeror shall provide satisfactory evidence of all required insurance coverage and licenses PRIOR TO PERFORMANCE.

2. Supplier Registration in buyWays – The successful Offeror must be an active supplier in Clemson University’s buyWays system. If the Offeror is not an active supplier, the Offeror agrees to complete their supplier registration within three (3) business days of receiving an email invitation to register. The invitation will be sent from support@sciquest.com.

3. QUALIFICATIONS - MANDATORY MINIMUM (JAN 2006): (a) In order to be qualified to receive award, you must meet the following mandatory minimum qualifications: Offerors must have a minimum of five years of experience in the work described herein.

(b) The Procurement Officer may, in his discretion, consider (1) the experience of a predecessor firm or of a firm’s key personnel which was obtained prior to the date offeror was established, and/or (2) any subcontractor proposed by offeror. (c) Provide a detailed, narrative statement providing adequate information to establish that you meet all the requirements stated in subparagraph (a) above. Include all appropriate documentation.

4. Be sure to see the Event Activities in the online bidding system for details on deadlines for questions and/or pre-bid meetings.

a. Deadline for Questions

Non-mandatory questions shall be submitted in the online bidding system under the Questions tab by the date and time listed herein. Answers will be posted in the online system following the deadline date. All Offerors are charged with a duty to inquire. By submitting an Offer, represents that the Offeror has read and understands the solicitation and that its offer is made in compliance with the solicitation. Offerors are expected to examine the solicitation thoroughly and should request an explanation of any ambiguities, discrepancies, errors, omissions, or conflicting statements in the solicitation. Failure to do so will be at the Offeror’s risk.

III. Scope of Work / Specifications

Clemson University seeks an experienced supplier to provide blown wool insulation and labor for the attic spaces in all 20 Lightsey Bridge apartments. The attic spaces are all accessed by scuttle hole. A map of the Lightsey Bridge buildings is provided below.

A. Specifications

• Blown wool R-value 38 insulation at a depth of 12.25 inches.

• Blown wool R-value 30 insulation at a depth of 12.25 inches may be used as an alternate.

• Blown wool R-value 30 insulation at a depth of 6-8 inches.

• Attic to be accessed using scuttle hole. Offeror will need an 8 ft. ladder to reach the scuttle hole on the landings. Insulation should cover all fire protection and water lines in attic. Offeror should verify depths will cover all water and fire protection lines prior to bidding. Work be performed during the University’s Winter Break period starting December 16, 2023, and must be completed by January 5, 2024. May 1st, 2024. Work hours are 9am-5pm M-F.

Attic and installation areas are as follows:

• Lightsey Bridge 1 Building 1 3,008 sq ft

• Lightsey Bridge 1 Building 2 3,008 sq ft

• Lightsey Bridge 1 Building 3 6,016 sq ft

• Lightsey Bridge 1 Building 4 3,008 sq ft

• Lightsey Bridge 1 Building 5 3,008 sq ft

• Lightsey Bridge 1 Building 6 3,008 sq ft

• Lightsey Bridge 1 Building 7 6,016 sq ft

• Lightsey Bridge 1 Building 8 3,008 sq ft

• Lightsey Bridge 1 Building 9 6,016 sq ft

• Lightsey Bridge 1 Building 10 3,008 sq ft

• Lightsey Bridge 2 Building 11 2,700 sq ft

• Lightsey Bridge 2 Building 12 2,700 sq ft

• Lightsey Bridge 2 Building 13 2,700 sq ft

• Lightsey Bridge 2 Building 14 2,700 sq ft

• Lightsey Bridge 2 Building 15 2,700 sq ft

• Lightsey Bridge 2 Building 16 2,700 sq ft

• Lightsey Bridge 2 Building 17 2,700 sq ft

• Lightsey Bridge 2 Building 18 2,700 sq ft

• Lightsey Bridge 2 Building 19 2,700 sq ft

• Lightsey Bridge 2 Building 20 2,700 sq ft

B. General Requirements

• The absence of detailed specifications or the omission of detailed descriptions shall be recognized as meaning that only the best commercial practices are to prevail and that only first quality materials and workmanship are to be used. All interpretations of the specifications shall be made from this statement. It is understood that the specifications or references to available specifications shall be sufficient to make the terms of such specifications binding on the Contractor.

• The Contractor shall provide and pay for all materials, tools, equipment, labor and professional and non-professional services, and shall perform all other acts and supply all other things necessary, to fully and properly perform and complete the work.

• Any measurements included herein are for informational purposes only. The successful offeror is responsible for accuracy of final measurements.

• The Contractor performance of the work shall comply with applicable federal, state, and local laws, rules and regulations.  The Contractor shall give required notices, shall procure necessary governmental licenses and inspections, and shall pay without burden to Clemson University, all fees and charges in connection therewith unless specifically provided otherwise.  In the event of violation, the Contractor shall pay all fees and penalties, including attorney’s fees and other defense costs and expenses in connection herewith.

• All work performed and materials used shall conform in every detail to the current rules and requirements of the National Fire Protection Association (NFPA), the Occupational Safety and Health Administration (OSHA), the National Electrical Code (NEC), and all other applicable national, state, and local authorities as is applicable.

• The Contractor shall maintain Clemson University’s facility in a neat and orderly manner during the entire course of the project.  Clemson University’s facilities shall be maintained in broom clean condition at the completion of work each day.  At the completion of work in each area, the Contractor will perform a final cleaning of debris prior to moving the installation crew to the next work area.

• The Contractor is expected to be able to perform the work with minimal supervision and should not rely on Clemson University to augment their resources.

IV. Terms and Conditions – Special

Offerors will enter an all inclusive total price in the online bidding system. Line one will include all materials, equipment, costs, fees, etc. Line two will include labor only. Both lines will be added together and the lowest, responsive and responsible supplier will be awarded. No other costs will be considered.

Map of Lightsey Bridge buildings

This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >