Wright ES Exterior Painting SKSD Addendum 1

Agency: Salem Keizer Public School District
State: Oregon
Level of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD15973249469290890
Posted Date: Mar 27, 2024
Due Date: Apr 11, 2024
Solicitation No: 2024-1062
Source: Members Only

Bid Information



Type
ITB
Status
Issued
Number
2024-1062 Addendum 1 (Wright ES Exterior Painting SKSD)
Issue Date & Time
3/15/2024 08:00:02 AM (PT)
Close Date & Time
4/11/2024 02:00:00 PM (PT)
Time Left
14 days 21 hours 50 minutes 41 seconds
Notes
Attach your bid security under response attachments. Be aware there is a 25MB size limit per file. If your document is larger than this, try rescanning at a lower resolution, or scan pages individually to stay below this size limit.

The District will only accept responses submitted on line via this interactive bidding system. If you require assistance with this process, please contact Purchasing at 503-399-3086.


Contact Information
Name
Shane Gott, PCS 3
Address
Procurement & Contracting Services
3630 State Street
Salem, OR 97301-5316 USA
Phone
(503) 3995519
Fax
Email
gott_shane@salkeiz.k12.or.us




Bid Documents







Document name Format


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



1 items in 1 pages

Bid Invitation

Acrobat / PDF


Bid Attachments



















File Name Description File Size


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



13 items in 1 pages

ADDENDUM 1.pdf
Addendum 1 - Describes changes to the bid. 138 KB

Pre-Bid Sign-In Sheet.pdf
Pre-Bid Sign-In sheet 252 KB

Pics.pdf
Building Pictures 103.56 MB

DIVISION_0_SECTION_00 2113_INSTRUCTIONS TO BIDDERS 1.21.21.pdf
INSTRUCTIONS TO BIDDERS 200 KB

DIVISION 0 SECTION 00210 PRE-BID REQUEST FOR INFORMATION.pdf
Pre-Bid Request Form 128 KB

DIVISION_0_SECTION_00400_FIRST TIER SUBCONTACTOR DISCLOSURE FORM rev5_18.pdf
First Tier Disclosure 119 KB

DIVISION_0_SECTION_00410_BID_BOND_FORM_rev5_18.pdf
Bid Bond 136 KB

DIVISION_00 5200 SAMPLE AGREEMENT FORM 23Nov2021.pdf (please login to view this document)
Sample of the construction contract. 152 KB

DIVISION_0_SECTION_00610 PERFORMANCE LABOR AND MATERIALS BOND 7_2018.pdf
Performance Bond 128 KB

DIVISION_0_SECTION_00669 ASBESTOS 7_2019.pdf
Requirements for Contractor to review ACM reports prior to commencement of work. 40 KB

DIVISION_0_SECTION_00823_PREVAILING_WAGE_RATES.pdf
Prevailing Wage 144 KB

SKSD Wright ES Ext Paint-Specifications (1).pdf
Specifications/Project Manual 11.09 MB

SKSD Wright ES Ext Paint-Drawings (1).pdf
Drawings 3.39 MB


Attachment Preview

ADDENDUM NO. 1
PURCHASING DEPARTMENT 3630 STATE STREET SALEM, OREGON 97301-5399 (503) 399-3086
BID 2024-1062
Wright ES Exterior Painting SKSD
Addendum Dated: March 27, 2024
Page 1 of 1 Page(s)
Closing Date: April 11, 2024, 2:00 PM
THE ABOVE BID IS HEREBY CHANGED AS INDICATED BELOW:
ATTACHMENTS:
Pre-Bid Sign-In Sheet
Pics.
ATTRIBUTES:
Attribute 14 – Schedule. Extend the substantial completion date to 8/16/2024.
QUESTIONS & ANSWERS:
Full or partial Primer:
Question: The bidders asked if they needed to primer just the areas where they
are scrapping paint off or the entire building
My response: Full prime all surfaces. Ref spec section 09 91 13
Scraping and Prep work:
Question: Bidders want to know how much of the building needs to be scraped
and what district is asking for prep work prior to painting.
My response: All surfaces need to be properly prepped. This involves scraping
where paint is peeling, using a brush on siding or a hand sander on metal where
paint is damaged, using JoeMax as a cleaner or approved alternative, and
pressure washing all surfaces to ensure a clean surface before paint is
applied. Just pressure washing by itself will not be enough to properly clean/prep
the surfaces and mitigate future issues.
Roof parapet cap:
Question: The roof sheet metal cap, does it need to be painting all the way over
the top and the backside or just the visible face?
My response: Paint the entire roof cap and the upper roof surfaces. See
attached photos of all roof top areas.
Roof Gutters:
Questions: Some of the gutters are on the roof above and not visible from the
ground. Do they need to be painted?
My response: Paint all the gutters while painting the upper roof surfaces. See
attached photos of all roof top areas.
Storage:
Questions: Will there be storage on site or do we need to provide our own?
My response: Please provide storage as an alternate. We will look into what
spaces we could store on site to possibly save money.(Ie storage room, empty
classroom, gym, etc)
Lead Paint testing:
Questions: Has there been any testing done for lead paint since there is multiple
layers and it is obviously old?
My Response: Report is attached to the specs and is already part of the bid
documents.
Working Hours/Length of Project:
Question: What hours can we work on site?
My response: The question arose due to the small window for the project. My
response is 2 part:
o City of Salem Noise Ordinance hours: 7:00 am to 10:00 pm.
o Extend the substantial completion date to 8/16 which gives a couple extra
weeks on the project. Please note that work has to be completed,
including punch, by the 8/16 date.
Flag pole:
Question: Does the district want to paint it?
My response: Yes, paint it.
END OF ADDENDUM 1
Page 2 of 2
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >