Wright ES Exterior Painting SKSD Addendum 1
Agency: | Salem Keizer Public School District |
---|---|
State: | Oregon |
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD15973249469290890 |
Posted Date: | Mar 27, 2024 |
Due Date: | Apr 11, 2024 |
Solicitation No: | 2024-1062 |
Source: | Members Only |
Bid Information
|
Contact Information
|
Bid Documents
Document name | Format | ||||
| |||||
Bid Invitation |
Acrobat / PDF |
Bid Attachments
File Name | Description | File Size | ||||
| ||||||
ADDENDUM 1.pdf |
Addendum 1 - Describes changes to the bid. | 138 KB | ||||
Pre-Bid Sign-In Sheet.pdf |
Pre-Bid Sign-In sheet | 252 KB | ||||
Pics.pdf |
Building Pictures | 103.56 MB | ||||
DIVISION_0_SECTION_00 2113_INSTRUCTIONS TO BIDDERS 1.21.21.pdf |
INSTRUCTIONS TO BIDDERS | 200 KB | ||||
DIVISION 0 SECTION 00210 PRE-BID REQUEST FOR INFORMATION.pdf |
Pre-Bid Request Form | 128 KB | ||||
DIVISION_0_SECTION_00400_FIRST TIER SUBCONTACTOR DISCLOSURE FORM rev5_18.pdf |
First Tier Disclosure | 119 KB | ||||
DIVISION_0_SECTION_00410_BID_BOND_FORM_rev5_18.pdf |
Bid Bond | 136 KB | ||||
DIVISION_00 5200 SAMPLE AGREEMENT FORM 23Nov2021.pdf (please login to view this document) |
Sample of the construction contract. | 152 KB | ||||
DIVISION_0_SECTION_00610 PERFORMANCE LABOR AND MATERIALS BOND 7_2018.pdf |
Performance Bond | 128 KB | ||||
DIVISION_0_SECTION_00669 ASBESTOS 7_2019.pdf |
Requirements for Contractor to review ACM reports prior to commencement of work. | 40 KB | ||||
DIVISION_0_SECTION_00823_PREVAILING_WAGE_RATES.pdf |
Prevailing Wage | 144 KB | ||||
SKSD Wright ES Ext Paint-Specifications (1).pdf |
Specifications/Project Manual | 11.09 MB | ||||
SKSD Wright ES Ext Paint-Drawings (1).pdf |
Drawings | 3.39 MB |
Attachment Preview
ADDENDUM NO. 1
PURCHASING DEPARTMENT • 3630 STATE STREET • SALEM, OREGON 97301-5399 • (503) 399-3086
BID 2024-1062
Wright ES Exterior Painting SKSD
Addendum Dated: March 27, 2024
Page 1 of 1 Page(s)
Closing Date: April 11, 2024, 2:00 PM
THE ABOVE BID IS HEREBY CHANGED AS INDICATED BELOW:
ATTACHMENTS:
• Pre-Bid Sign-In Sheet
• Pics.
ATTRIBUTES:
• Attribute 14 – Schedule. Extend the substantial completion date to 8/16/2024.
QUESTIONS & ANSWERS:
Full or partial Primer:
Question: The bidders asked if they needed to primer just the areas where they
are scrapping paint off or the entire building
My response: Full prime all surfaces. Ref spec section 09 91 13
Scraping and Prep work:
Question: Bidders want to know how much of the building needs to be scraped
and what district is asking for prep work prior to painting.
My response: All surfaces need to be properly prepped. This involves scraping
where paint is peeling, using a brush on siding or a hand sander on metal where
paint is damaged, using JoeMax as a cleaner or approved alternative, and
pressure washing all surfaces to ensure a clean surface before paint is
applied. Just pressure washing by itself will not be enough to properly clean/prep
the surfaces and mitigate future issues.
Roof parapet cap:
Question: The roof sheet metal cap, does it need to be painting all the way over
the top and the backside or just the visible face?
My response: Paint the entire roof cap and the upper roof surfaces. See
attached photos of all roof top areas.
Roof Gutters:
Questions: Some of the gutters are on the roof above and not visible from the
ground. Do they need to be painted?
My response: Paint all the gutters while painting the upper roof surfaces. See
attached photos of all roof top areas.
Storage:
Questions: Will there be storage on site or do we need to provide our own?
My response: Please provide storage as an alternate. We will look into what
spaces we could store on site to possibly save money.(Ie storage room, empty
classroom, gym, etc)
Lead Paint testing:
Questions: Has there been any testing done for lead paint since there is multiple
layers and it is obviously old?
My Response: Report is attached to the specs and is already part of the bid
documents.
Working Hours/Length of Project:
Question: What hours can we work on site?
My response: The question arose due to the small window for the project. My
response is 2 part:
o City of Salem Noise Ordinance hours: 7:00 am to 10:00 pm.
o Extend the substantial completion date to 8/16 which gives a couple extra
weeks on the project. Please note that work has to be completed,
including punch, by the 8/16 date.
Flag pole:
Question: Does the district want to paint it?
My response: Yes, paint it.
END OF ADDENDUM 1
Page 2 of 2
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation.
For more information, please visit the Publication URL Web page.
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.