Bid 23-065 Mulberry Grove Park Renovation
Bid 23-065 Mulberry Grove Park Renovation
Issue Date: 12/14/2023
Questions Deadline: 1/2/2024 03:00 PM (CT)
Response Deadline: 1/5/2024 03:00 PM (CT)
Contact Information
Contact: Daina DeNye Purchasing Officer
Address: 150 Dexter Ct.
Elgin, IL 60120
Phone: (847) 931-5604
Email: denye_d@cityofelgin.org
Page 1 of 13 pages
Deadline: 1/5/2024 03:00 PM (CT)
Bid 23-065 Mulberry Grove Park Renovation
Event Information
Number:
Bid 23-065 Mulberry Grove Park Renovation
Title:
Bid 23-065 Mulberry Grove Park Renovation
Type:
Invitation to Bid
Issue Date:
12/14/2023
Question Deadline: 1/2/2024 03:00 PM (CT)
Response Deadline: 1/5/2024 03:00 PM (CT)
Notes:
NOTICE TO BIDDERS
Mulberry Grove Park Renovation
Bid 23-065
Sealed Bids will be received by the City of Elgin, Illinois (Owner) electronically by the
Purchasing Department, until 3:00 P.M, local time, on Friday, January 5, 2024 for
the Mulberry Grove Park Renovation. The specifications and bidding documents
are available for viewing and download for no cost
at https://cityofelgin.ionwave.net/VendorRegistration/PreliminaryInfo.aspx, the City
of Elgin’s electronic bidding web portal.
At that time the bids will be opened online by the Purchasing Department.
The proposed improvement includes removal of existing playground and surfacing,
asphalt paving, concrete paving, curb, asphalt color coat and crack repair, artificial
turf with playground pad, chain-link vinyl coated fencing and gates, playground
equipment, site furnishings, pickleball installation, rain garden, underdrainage,
landscaping and all other appurtenant work and materials necessary to complete the
project.
An original bid bond (in the amount of 5% of the original bid amount) must be
delivered to the City of Elgin Purchasing Department, 150 Dexter Court no later than
12:00 pm on January 5, 2024. The bid bond with surety satisfactory to the City, in
either surety bond, cash, certified check, cashier’s check, or bank money order on a
solvent bank shall be made payable to the City of Elgin, Illinois. The sum shall be
forfeited in the case the successful bidder fails to enter into a binding contract and
provide a properly executed surety bond within 15 days after the date the contract is
awarded by the City Council.
The bidder shall submit a list of qualified references for projects of similar size and
scope of this project. Proposals withdrawn may not be re submitted at the same
letting. Each bidder shall satisfy the City as to their ability, financially or otherwise, to
carry out the work. The City of Elgin reserves the right to reject any and all bids
and/or to waive any informality in any bids.
The successful bidder shall be required to furnish a satisfactory contract bond to the
City of Elgin by a surety company authorized to do business in the State of Illinois
covering the full amount of the contract. The successful bidder shall pay prevailing
wage, shall provide certified payrolls to the City for the duration of the project and
comply with the Responsible Bidder’s Ordinance and Elgin Residency Ordinance for
the duration of the project.
Page 2 of 13 pages
Deadline: 1/5/2024 03:00 PM (CT)
Bid 23-065 Mulberry Grove Park Renovation
Minority business firms are encouraged to submit bids. Successful contract bidders
are also encouraged to utilize minority businesses as sub-contractors for supplies,
equipment, services, and construction. This project is being financed, in part, with funds
from the Illinois Department of Natural Resources, “Open Space Lands Acquisition &
Development” (OSLAD) grant program.
All bid documents shall be uploaded to
https://cityofelgin.ionwave.net/CurrentSourcingEvents.aspx.
Questions regarding this bid package can be directed to Liz Dafoe of Upland
Design Ltd at 312.350.4088 ext 301
Dated December 11, 2023
Daina DeNye, CPPO
Purchasing Director
City of Elgin
Bid Activities
5% Bid Bond
1/5/2024 12:00:00 PM (CT)
An original bid bond (in the amount of 5% of the original bid amount) must be delivered to the City of Elgin Purchasing
Department, 150 Dexter Court no later than 12:00 pm on January 5, 2024. The bid bond with surety satisfactory to
the City, in either surety bond, cash, certified check, cashier’s check, or bank money order on a solvent bank shall be
made payable to the City of Elgin, Illinois. The sum shall be forfeited in the case the successful bidder fails to enter
into a binding contract and provide a properly executed surety bond within 15 days after the date the contract is
awarded by the City Council.
Bid Attachments
2023_12_06 Mulberry Grove Specifications Final.pdf
Specs
Mulberry Grove Drawings final.pdf
Drawings
Bid Bond.pdf
Bid Bond
CERTIFICATION REQUIREMENTS.pdf
Certification Requirements
SEXUAL HARASSMENT POLICY.pdf
Sexual Harassment - - Policies and Programs
BIDDER’S EMPLOYEE UTILIZATION FORM.pdf
Bidder's Employee Utilization Form
RESPONSIBLE BIDDER AFFIDAVIT.pdf
RESPONSIBLE BIDDER AFFIDAVIT
Download
Download
Download
Download
Download
Download
Download
Page 3 of 13 pages
Deadline: 1/5/2024 03:00 PM (CT)
Bid 23-065 Mulberry Grove Park Renovation
INSURANCE REQUIREMENTS.pdf
Insurance Requirements
REFERENCES.pdf
References
Agreement.pdf
Agreement
BID_PROPOSAL_FORM-1182 Mulberry FINAL.xls
Bid Form
Requested Attachments
Specs
Drawings
Bid Bond
(Attachment required)
Certification Requirements
(Attachment required)
Sexual Harassment - - Policies and Programs
(Attachment required)
Bidder's Employee Utilization Form
(Attachment required)
RESPONSIBLE BIDDER AFFIDAVIT
(Attachment required)
Insurance Requirements
(Attachment required)
Your insurance certificate as it comports to the bid requirements.
References
(Attachment required)
Agreement
Bid Form
(Attachment required)
Bid Lines
1 Site Preparation, Removals & Earthwork, Complete
(Response required)
Quantity: 1 UOM: LS
Supplier Notes:
Price: $
2 Undercut and PG&E(Allowance as directed by Owner)
(Response required)
Quantity: 100 UOM: CY
Price: $
Supplier Notes:
Download
Download
Download
Download
Total: $
Additional notes
(Attach separate sheet)
Total: $
Additional notes
(Attach separate sheet)
Page 4 of 13 pages
Deadline: 1/5/2024 03:00 PM (CT)
Bid 23-065 Mulberry Grove Park Renovation
3 Stabilized Construction Entrance
(Response required)
Quantity: 1 UOM: EA
Supplier Notes:
4 Silt Fence
(Response required)
Quantity: 1 UOM: LS
Supplier Notes:
5 Temporary Concrete Washout
(Response required)
Quantity: 1 UOM: EA
Supplier Notes:
6 Inlet Protection
(Response required)
Quantity: 1 UOM: LS
Supplier Notes:
7 Asphalt Paving - Trail
(Response required)
Quantity: 307 UOM: SY
Supplier Notes:
8 Asphalt Paving - Court
(Response required)
Quantity: 1193 UOM: SY
Supplier Notes:
9 Aphalt Color Coat - Pickleball
(Response required)
Quantity: 1193 UOM: SY
Supplier Notes:
Price: $
Price: $
Price: $
Price: $
Price: $
Price: $
Price: $
Total: $
Additional notes
(Attach separate sheet)
Total: $
Additional notes
(Attach separate sheet)
Total: $
Additional notes
(Attach separate sheet)
Total: $
Additional notes
(Attach separate sheet)
Total: $
Additional notes
(Attach separate sheet)
Total: $
Additional notes
(Attach separate sheet)
Total: $
Additional notes
(Attach separate sheet)
Page 5 of 13 pages
Deadline: 1/5/2024 03:00 PM (CT)
Bid 23-065 Mulberry Grove Park Renovation