CONTRACTOR:
_____________________________________________________
CONTACT NAME: _____________________________________________________
ADDRESS:
_____________________________________________________
CITY/STATE/ZIP: _____________________________________________________
PHONE NUMBER: _____________________________________________________
FAX NUMBER:
_____________________________________________________
EMAIL:
_____________________________________________________
TO BE EXECUTED IN DUPLICATE
BOOK 1:
PROJECT INFORMATION, INSTRUCTIONS TO BIDDERS, AND EXECUTION DOCUMENTS
CONTRACT NO. C1602R
KENWOOD ACADEMY LINK AND MECHANICAL PROJECT
5015 SOUTH BLACKSTONE AVENUE
CHICAGO, IL 60615
PROJECT #05326
PUBLIC BUILDING COMMISSION OF CHICAGO
Mayor Brandon Johnson
Chairman
Ray Giderof
Acting Executive Director
Richard J. Daley Center
50 West Washington Street
Room 200
Chicago, Illinois 60602
312-744-3090
www.pbcchicago.com
ISSUED FOR BID ON FEBRUARY 8, 2024
Any Contract entered into as a result of this bid process is governed by: All Volumes (as applicable) of Book1 “Project Information, Instructions To Bidders, and
Execution Documents;” Book 2 “Standard Terms and Conditions for Construction Contracts” and Book 3 - “Technical Specifications” and the Drawings.
.
Date of Issue: February 8, 2024
PBC: C1602R_Kenwood Academy Link and Mechanical Project_Book 1 Instructions to Bidders
Page 1 of 44
PUBLIC BUILDING COMMISSION OF CHICAGO
TABLE OF CONTENTS
I. INTRODUCTION......................................................................................................................................................... 4
II. PROJECT INFORMATION ......................................................................................................................................... 4
A. GENERAL INFORMATION ................................................................................................................................... 4
B. MANDATORY PROJECT SPECIFIC CONTRACTOR STAFFING REQUIREMENTS......................................... 6
C. SCHEDULING SOFTWARE REQUIREMENTS ................................................................................................... 6
D. ONLINE COLLABORATION AND DOCUMENTATION MANAGEMENT SYSTEM REQUIREMENTS ............... 6
E. TIME OF COMPLETION ....................................................................................................................................... 6
F. COMMISSION’S CONTRACT CONTINGENCY ................................................................................................... 6
G. COPIES OF DRAWINGS AND SPECIFICATIONS FURNISHED ........................................................................ 6
H. LIQUIDATED DAMAGES...................................................................................................................................... 6
I. PREVAILING WAGE RATES................................................................................................................................ 7
III. INSTRUCTIONS FOR BIDDERS................................................................................................................................ 7
A. EXAMINATION OF DOCUMENTS BY BIDDER ................................................................................................... 7
B. INTERPRETATIONS OF ADDENDA .................................................................................................................... 7
C. PRE-QUALIFICATION OF BIDDERS ................................................................................................................... 7
D. EVIDENCE OF CONTINUING QUALIFICATIONS OF BIDDER........................................................................... 7
E. PREPARATION OF BID........................................................................................................................................ 8
F. BID DEPOSIT........................................................................................................................................................ 8
G. BIDDER’S EXECUTION OF BID........................................................................................................................... 9
H. AFFIDAVIT OF NON-COLLUSION ....................................................................................................................... 9
I. MBE AND WBE COMMITMENTS......................................................................................................................... 9
J. LOCAL BUSINESS SUBCONTRACTING PARTICIPATION AND COMMUNITY HIRING................................... 9
K. DISCLOSURE OF RETAINED PARTIES ........................................................................................................... 10
L. SUBMISSION OF BID......................................................................................................................................... 10
M. WITHDRAWAL OF BIDS BEFORE BID OPENING ............................................................................................ 10
N. OPENING OF BIDS ............................................................................................................................................ 10
O. EVALUATION OF BIDS ...................................................................................................................................... 10
P. BASIS OF AWARD ............................................................................................................................................. 10
Q. PERFORMANCE AND PAYMENT BOND AND INSURANCE ........................................................................... 11
R. PROTESTS ......................................................................................................................................................... 11
S. LICENSING ......................................................................................................................................................... 11
T. AWARD OF CONTRACT, CANCELLATION, OR REJECTION OF BIDS .......................................................... 12
U. ALTERNATES-COMMISSION DISCRETION..................................................................................................... 12
V. PROJECT LABOR AGREEMENT (PLA) ............................................................................................................ 12
IV. BID AND EXECUTION DOCUMENTS ..................................................................................................................... 13
A. CONTRACTOR’S BID......................................................................................................................................... 13
B. BID FORM – KENWOOD ACADEMY LINK AND MECHANICAL PROJECT ..................................................... 14
Date of Issue: February 8, 2024
PBC: C1602R_Kenwood Academy Link and Mechanical Project_Book 1 Instructions to Bidders
Page 2 of 44
PUBLIC BUILDING COMMISSION OF CHICAGO
C. SITEWORK ALLOWANCE SCHEDULE ............................................................................................................. 15
D. CAMERA ALLOWANCE ..................................................................................................................................... 17
E. ENVIRONMENTAL ALLOWANCE...................................................................................................................... 17
F. ALTERNATES..................................................................................................................................................... 17
G. ACCEPTANCE OF THE BID............................................................................................................................... 18
V. BID SUPPORT DOCUMENTS.................................................................................................................................. 19
A. BASIS OF AWARD (AWARD CRITERIA FIGURE) ............................................................................................ 19
VI. ADDITIONAL DOCUMENTS TO BE EXECUTED .................................................................................................... 23
Affidavit of Non-collusion..................................................................................................................................................... 23
SCHEDULE B - Joint Venture Affidavit (1 of 3)................................................................................................................... 24
SCHEDULE C - Letter of Intent from MBE/WBE (1 of 2) .................................................................................................... 27
SCHEDULE E - Request for Waiver from MBE/WBE Participation .................................................................................... 31
Disclosure of Retained Parties............................................................................................................................................ 32
Performance and Payment Bond ........................................................................................................................................ 34
Bond Approval..................................................................................................................................................................... 37
DOCUMENT SUBMITTAL CHECKLIST ............................................................................................................................. 38
EXHIBIT #1 COOK COUNTY PREVAILING WAGE RATES – EFFECTIVE FEBRUARY 8, 2024 .................................... 39
EXHIBIT #2 INSURANCE REQUIREMENTS ..................................................................................................................... 40
EXHIBIT #3 PROJECT COMMUNITY AREA MAP............................................................................................................. 43
EXHIBIT #4 ASSIST AGENCIES........................................................................................................................................ 44
Date of Issue: February 8, 2024
PBC: C1602R_Kenwood Academy Link and Mechanical Project_Book 1 Instructions to Bidders
Page 3 of 44
PUBLIC BUILDING COMMISSION OF CHICAGO
I. INTRODUCTION
Thank you for your interest in bidding on this project, which is being undertaken by the Public Building Commission of Chicago.
The Public Building Commission of Chicago (hereafter, the PBC, or Commission) is a municipal corporation with a statutory
mandate to procure and award contracts for the construction of public buildings in the City of Chicago, and to oversee the
construction of those public buildings until they are turned over to the user agency that will own and operate each new facility.
This is the first page of text of Book 1, which along with Book 2, Book 3, and the project drawings, comprise the PBC’s
construction contract. The balance of this Book 1 provides a brief description of the project, instructions for completing and
submitting your bid, the bid pages, and the forms which must accompany your bid. Book 2 is the Standard Terms and
Conditions of the contract. Book 3 is the Technical Specifications for the work to be performed on this project. The architect
or engineer for the project will provide the drawings and other documents that may be necessary for you to bid on and/or
perform the work. Each of the Books, along with the drawings and any other documents prepared by the architect or engineer,
are Contract Documents. Collectively, the Contract Documents comprise the Contract. The Contract Documents are defined
in Section 1 of Book 2, Standard Terms and Conditions.
II. PROJECT INFORMATION
A. General Information
1. Bids will be received by the Public Building Commission of Chicago for the following Project in accordance with the
Contract Documents set forth below:
CONTRACT NO. C1602R
KENWOOD ACADEMY LINK AND MECHANICAL PROJECT
5015 SOUTH BLACKSTONE AVENUE
CHICAGO, IL 60615
PROJECT #05326
2. General Description of Scope of Work:
The project entails constructing an enclosed second level link between the main Kenwood Academy building and
the Canter building along with associated site enhancements for landscaping and parking. Interior scope consists
of HVAC improvements of mechanical units for the Athletic Wing of the school. Locker/Team/Trainer Room
Conversion (3 areas): Renovated Trainer Room, Enlarged Teams Lockers, Renovated Electrical Room for
Link/MEP, Lighting, ADA Scope. This Project includes a Phasing Plan.
3. Construction Budget for Base Work Only: $10,500,000.00 (excluding Allowances and Commission’s Contract
Contingency Funds).
4. User Agency: Chicago Public Schools
5. Project is located in Ward: 4
6. For purposes of the community hiring requirement, “Project Community Residents” shall mean persons domiciled
within the Project Community Areas as designated on “Exhibit# 3 Project Community Area Map.”
7. Requests for Information: Bidders are to submit requests for information, in writing, via email to the attention of
Patricia Montenegro, PBC Contract Officer at: patricia.montenegro@cityofchicago.org.
8. Contract Documents Availability: Documents are available at: Aloha Document Services, Inc. dba Aloha Print
Group, 141 West Jackson Boulevard, Suite A100A, Chicago, IL 60604. Contact name: Virginia (Ginger) Peak.
Telephone number: 312-542-1300 or orders@alohaprintgroup.com.
Planroom: https://sites.google.com/alohaprintgroup.com/pbc-c1602r/home
9. Pre-Bid Meeting Date, Time, and Location: Thursday, February 15, 2024, at 2:00p.m. via ZOOM virtual meeting
platform. For meeting details, refer to Section II.A.21.
10. Technical Review Meeting Date, Time, and Location: Thursday, February 15, 2024, at 2:30p.m. via ZOOM
virtual meeting platform. For meeting details, refer to Section II.A.21.
Date of Issue: February 8, 2024
PBC: C1602R_Kenwood Academy Link and Mechanical Project_Book 1 Instructions to Bidders
Page 4 of 44
PUBLIC BUILDING COMMISSION OF CHICAGO
11. Site Visit Date, Time, and Location: Monday, February 19, 2024, at 9:00a.m. at the Kenwood Academy High
School, located at 5015 South Blackstone Avenue, Chicago, Illinois 60615. Contractors are to enter through the
Main Entrance (Door #1).
Bidders shall be responsible for inspecting the Site to become familiar with the Project. Bidders are advised that
access to the School is restricted. Failure of the Bidders to become familiar with the Project shall not relieve or alter
the Bidder’s responsibility for completing the Work as required by the Contract Documents.
*NOTES REGARDING MEETINGS:
a. Meetings referenced in Items #9 Pre-Bid and #10 Technical Review above are NOT mandatory.
b. Subcontractors and Suppliers are encouraged to attend the meetings.
c. Proper PPE must be worn at all times on the site.
d. Bidders shall comply with all COVID-19 protocols in accordance with CDC guidelines.
12. PBC Class A Prequalified Bidders for the KENWOOD ACADEMY LINK AND MECHANICAL PROJECT are
listed below:
Class A
All-Bry Construction Company; All Construction Group; Berglund Construction Company; Blinderman Construction
Company, Inc.; BOWA Construction; Brandenburg Industrial Service Company; Broadway Electric, Inc.; Burling
Builders, Inc.; Clark Construction Group – Chicago, LLC; F.H. Paschen, S.N. Nielsen & Associates, LLC; Friedler
Construction Company; Gilbane Building Company; GMA Construction Group; Henry Bros. Co.; Hunt Construction
Group, Inc.; James McHugh Construction Company; K.R. Miller Contractors, Inc.; Path Construction Company, Inc.;
Powers & Sons Construction Company, Inc.; The George Sollitt Construction Company; Turner Construction
Company; Tyler Lane Construction, Inc.; UJAMAA Construction, Inc.; Walsh Construction Company II
13. Bid Due Date and Public Bid Opening Date, Time, and Location: Bids are due Friday, March 8, 2024 at
11:00a.m. and a Public Bid Opening will be held immediately following receipt of bids and will be live streamed on
the PBC’s YouTube page.
14. Amount of Bid Deposit:
5% amount of bid
15. Document Deposit:
N/A
16. Cost for Additional Documents (per set): At the Contractor’s own expense
17. MBE/WBE Contract Goals:
26% MBE and 6%WBE
18. Source of Funding:
Chicago Public Schools (TIF)
19. Pre-Award Meeting Date, Time, and Location: A Pre-Award meeting is tentatively scheduled for Monday, March
11, 2024 at 10:00a.m. via ZOOM virtual meeting platform. For meeting details, refer to Section II.A.21.
For the Pre-Award Meeting, the Lowest Responsive and Responsible Bidder shall be required to:
a. Have, at minimum, the Project Executive, Project Manager (if known), and Cost Estimator in attendance at the
meeting
b. Invite principals of all MBE/WBE Subcontractors listed on Schedule D
c. Provide and be prepared to discuss the Schedule of Values for the project
20. Notice of Award is anticipated to be issued following the March 2024 PBC Board of Commissioners Meeting. The
successful General Contractor will be required to return a compliant Certificate of Insurance and Payment and
Performance Bond within seven (7) days of the issuance of the Notice of Award.
21. The Pre-Bid/Technical Review Meetings will be held on ZOOM virtual meeting platform. To join click on the
link or call the number below:
Meeting Link:
Meeting Phone Number:
Meeting ID:
Meeting Passcode:
Kenwood Academy Link and Mechanical Project ZOOM
312-626-6799
874 9745 7163
None required
Date of Issue: February 8, 2024
PBC: C1602R_Kenwood Academy Link and Mechanical Project_Book 1 Instructions to Bidders
Page 5 of 44