The work for the WEBBER AVENUE CSO SEPARATION/ACADIA AVENUE MILL & FILL PAVING shall consist of, but not be limited to, the complete and satisfactory construction of installation of:
- 2,910 SY of Pavement Removal – Strip
- 11,600 SY of Pavement Removal - Mill
- 387 Tons of 9.5mm HMA Shim
- 1,060 Tons of 12.5mm HMA Surface Course
- 150 Tons of 19mm HMA Base
- 141 Tons of Hand-Placed Pavement
- 800 SY of Loam, Seed, & Mulch
- 410 CY of MDOT 703.06 Type D (2020)
- 90 CY of MDOT 703.06 Type A (2020)
- 920 LF of 12” SDR35 PVC Storm Drain
- 180 LF of 8” SDR35 PVC Storm Drain
- 10, 4-ft Dia. Precast Catch Basins
- 2, 4-ft Dia. Precast Sewer Manholes
Work within Webber Avenue will include the separation of the existing combined system located between Lisbon Street & Fourth Street. In addition, Webber Avenue (from Lisbon Street to Pleasant Street) will receive a finish pave surface, following a 2” mill along the full existing street width. Existing paved sidewalk along the easterly side of Webber will be removed, gravel shimmed, fine-graded, and repaved with 2, 1” lifts of 9.5mm HMA. Existing stumps will be removed prior to sidewalk replacement. The existing paved sidewalk along the westerly side of Webber Avenue will be removed, and replaced with a loamed & seeded esplanade with Cape Cod concrete curbing.
Work within Acadia Avenue will include a finish pave surface, following a 2” mill along the full existing street width from Lisbon Street to Pleasant Street. In addition to the paving, there are two proposed sewer manholes within Acadia Avenue.