The City of Fitchburg, the Awarding Authority, invites sealed bids for the “HVAC Upgrades – Memorial Middle School &Reingold Elementary”, in accordance with the Drawings and Specifications prepared by BLW Engineers, 311 Great Road, Littleton, MA 01460, dated March 13, 2024, for installation of new unit ventilators with VRF and hot water coils serving classrooms at Memorial Middle School and Reingold Elementary School; estimated construction cost $2,500,000.
General Contractor bids will be received until April 10, 2024, at 2:00 PM at
www.biddocs.com
. General Contractor must be DCAMM certified in General Building Construction.
Filed sub-bids will be received until March 27, 2024, at 2:00 PM at
www.biddocs.com
. Filed sub-bid categories for the purposes of this bid are: Flooring, Painting, HVAC, and Electrical.
A bid deposit of at least five percent (5%) of the total project is required. A Performance Bond and a Labor and Materials Payment Bond, each in the sum of 100% of the Contract Price will be required of the successful Bidder. Project is subject to compliance with prevailing wage requirements.
This solicitation is being conducted in accordance with the provisions of Massachusetts General Laws Chapter 149, and any resulting contract will be strictly awarded in accordance with the requirements of the solicitation. The City reserves the right to reject any or all bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional bids. The City reserves the right to waive all informalities not involving price, time, or changes in the scope of work and to negotiate contract terms with the successful bidder.
Drawings, Specifications, Terms and Conditions, and Forms may be obtained at
www.biddocs.com
under the project number BDO# B24-M966. Complete sets of bidding documents shall be used in preparing bids; the City does not assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of bidding documents or for modifications to the bidding documents. The project is being bid electronically, there will be no hard copies accepted. A hard copy of the contract documents can be seen at:
Nashoba Blue Inc.
433 Main Street
Hudson, MA 01749
978-568-1167
A Pre-Bid meeting will be held on March 19, 2024 at 9:30 AM, at Memorial Middle School, 615 Rollstone Street, Fitchburg, MA. After meeting at Memorial Middle School, bidders will travel to Reingold Elementary School, 70 Reingold Ave, Fitchburg, MA. Bidders shall examine all information and materials contained in and with this solicitation. Failure to do so shall be at the