Addendum No 1A - Summer Painting Revisions

Agency: Greenville County School District
State: Michigan
Level of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD16707372634728351
Posted Date: Apr 5, 2024
Due Date: Apr 17, 2024
Solicitation No: 424-89 Addendum 1A - Summer Painting Revisions
Source: Members Only
Solicitation # Description Addendum Closing Date Closing Time
424-89 Addendum 1A - Summer Painting Revisions.pdf Addendum No 1A - Summer Painting Revisions Addendum No 1A 4/17/2024 11:00 A.M. EDT

Attachment Preview

Bethel Elementary School 2024 Paint Scope – ADMIN SUITE ONLY
PAINT ALL paintable doors, frames, storefronts and mullions, both sides, throughout suite (outlined in red below.)
Prepare surfaces for proper adhesion prior to painting.
Where applicable, repair all pre-cast joints, minor block joints and sheetrock cracks within painted areas. Patch
all holes without screws or hanging equipment.
Protect all murals unless otherwise noted.
Protect all promethean boards and parts. Do not disassemble any parts.
PAINT ALL PAINTABLE INTERIOR SURFACES INCLUDING CEILINGS, UNLESS OTHERWISE NOTED
START AND STOP ALL ACCENT COLORS @ INSIDE CORNERS, UNLESS OTHERWISE NOTED
NEW NEUTRAL = SW 7010 WHITE DUCK
ALL WALLS TO BE NEW NEUTRAL, UNLESS OTHERWISE NOTED
ALL INTERIOR HOLLOW METAL FRAMES AND DOORS TO MATCH EXISTING
ALL OFFICES TO BE NEW NEUTRAL, UNLESS OTHERWISE NOTED
ALL SINGLE OCCUPANT RESTROOMS TO BE NEW NEUTRAL
EXTERIOR BLOCK WALL AT FRONT LOBBY HAS WATER DAMAGE – ENSURE PROPER PREP
Bethel Elementary School 2024 Paint Scope
Page 1
Greer High School 2024 Paint Scope – CORE SPACES
PAINT ALL paintable doors, frames, storefronts and mullions, both sides, throughout facility. Prepare surfaces for
proper adhesion prior to painting.
Where applicable, repair all pre-cast joints, minor block joints and sheetrock cracks within painted areas. Patch
all holes without screws or hanging equipment.
Protect all murals unless otherwise noted.
Protect all promethean boards and parts. Do not disassemble any parts.
PAINT ALL PAINTABLE INTERIOR SURFACES INCLUDING CEILINGS, UNLESS OTHERWISE NOTED
START AND STOP ALL ACCENT COLORS @ INSIDE CORNERS, UNLESS OTHERWISE NOTED
NEW NEUTRAL = SW 7010 WHITE DUCK
ACCENT 1 = SW 7663 MONORAIL SILVER
ACCENT 2 = SW 7659 GRIS
ACCENT 3 = SW 6390 BOSC PEAR
ACCENT 4 = SW 6258 TRICORN BLACK
EXTERIOR:
o PAINT ALL HOLLOW METAL DOORS AND FRAMES SW 6258 TRICORN BLACK
ALL WALLS TO BE NEW NEUTRAL, UNLESS OTHERWISE NOTED
ALL INTERIOR HOLLOW METAL FRAMES AND DOORS TO MATCH EXISTING
ALL STAIRWELLS: ACCENT 1 AT LANDING WALL; ACCENT STRIPING THROUGHOUT
ACCENT STRIPING IN GROUP TOILETS AND STAIRS: TOP HALF OF TOP BLOCK NEW NEUTRAL; BOTTOM HALF OF
TOP BLOCK ACCENT 3; NEXT FULL BLOCK ACCENT 4
ACCENT STRIPING ON CORRIDOR WALLS: REPLACE GOLD STRIPING WITH ACCENT 3; REPLACE GREEN AND PURPLE
STRIPING WITH ACCENT 4 – DO NOT LEAVE GAP; STOP STRIPING 8” FROM EACH END
DO NOT PAINT CLASSROOMS, UNLESS OTHERWISE NOTED
DO NOT PAINT SINGLE OCCUPANT RESTROOMS
DO NOT PAINT OFFICES, UNLESS OTHERWISE NOTED
INCLUDE PAINTING OF FINE ARTS WING – ALL SPACES INCLUDING CLASSROOMS & OFFICES (SEE DIAGRAM)
INCLUDE PAINTING OF ATHLETICS WING – ALL SPACES INCLUDING CLASSROOMS & OFFICES (SEE DIAGRAM)
INCLUDE $20,000 ALLOWANCE TO REPLACE VINYL DECALS/LETTERING & TOUCH UP OR REPAINT YELLOW JACKET
MURALS WHERE BEING COVERED
ON CAMPUS ATHLETIC FACILITIES:
o TICKET BOOTH – PAINT DOOR BLACK & ALL HOLLOW METAL FRAMES; PAINT INSIDE NEW NEUTRAL
o CONCESSIONS – PAINT ALL RAILS BLACK; PAINT INSIDE NEW NEUTRAL
o RESTROOMS – PAINT WOOD TRIM AT TOP NEW NEUTRAL; PARTIAL AND FULL BLOCK BELOW GOLD
o SOFTBALL PRESSBOX - ALL DOORS AND FRAMES BLACK; NEW NEUTRAL EXTERIOR WITH ACCENT STRIPING
AT WINDOW – GOLD STRIPE EXTENT OF WINDOW HEIGHT AROUND PERIMETER, 12” BLACK STRIPE ABOVE
WINDOWN AROUND PERMINATER; INSIDE NEW NEUTRAL; ALL STEEL OF STAIRS NEW NEUTRAL
o SOFTBALL DUGOUT – NO PAINT
o SOFTBALL STORAGE – PAINT DOORS AND FRAMES, AND WOOD AT DOOR HEAD BLACK
o BASEBALL PRESSBOX – PAINT BLACK WITH GOLD STRIPE (2 BLOCKS); PAINT ALL WOOD
DOORS/TRIM/WINDWOS BLACK; INSIDE NEW NEUTRAL
o BASEBALL DUGOUT – PAINT GOLD STRIPE ACCENT 3
OFF CAMPUS FOOTBALL STADIUM (8 BUILDINGS)
o PAINT ALL BUILDINGS BASE ACCENT 3; NEXT BLOCK PAINT BLACK; ALL ELSE ACCENT 1
o ALL BUILDINGS PAINT HOLLOW METAL DOORS AND FRAMES BLACK
o ALL BUILDINGS PAINT INTERIOR WHITE DUCK
o RESTROOMS: TOP WOOD TRIM BLACK; PARTIAL BLOCK BELOW ACCENT 3; AL ELSE WHITE DUCK
Greer High School 2024 Paint Scope
Page 1
o PRESS BOX: PAINT EXTERIOR DOOR & FRAMES BLACK; PAINT INTERIOR FRAMES BLACK; NO PAINT ON
WALLS
DISPLAY CASE - PAINT FRAMES BLACK
GREEN SCREEN; INCLUDE COLUMN & BUMP OUT
MEDIA CENTER: PAINT COLUMNS ACCENT 3; INCLUDE PAINTING OF OFFICES AND ROOMS – ACCENT 1 AT
WALL ACROSS DOOR
GROUP TOILETS: ACCENT 2 WHERE SHOWN; ACCENT STRIPING THROUGHOUT; CEILINGS NEW NEUTRAL
ACCENT 1 WHERE SHOWN
MATCH ACCENT STRIPING OF STAIRS AND GROUP TOILETS
STAIRS: ACCENT 1 WHERE SHOWN; ACCENT STRIPING THROUGHOUT; CHANGE HANDRAILS TO ACCENT 4
KITCHEN: ACCENT 2 WHERE SHOWN; 2 DOORS TO CAFETERIA MARCH ACCENT SIZE AND LOCATION – CHANGE
TO ACCENT 3 AND ACCENT 4; PAINT OVER STRIPES ON SIDE WALLS; PAIND ALL EXTERIOR AT DOCK AREA
INCLUDING CEILINGS
PAINT DOWNSPOUT TO MATCH EXISTING
⑩ ATHLETIC LOCKER ROOMS: PREP AND PAINT LOCKERS ACCENT 4; MATCH STRIPE AND WAINSCOAT WITH NEW
GOLD AND BLACK - @ TOILET AREA WRAP TO FIRST INSIDE CORNER STOP
⑪ GYMNASIUM: PAINT CEILING AND STRUCTURE, AND DUCT WORK NEW NEUTRAL; COVER ALL YELLOW JACKETS
AND LETTERING; REPAINT STRIPING AND DIAMONDS WITH NEW BLACK AND GOLD
PAINT 10 BLOCKS DOWN ACCENT 3; NEXT 2 BLOCKS DOWN ACCENT 4; NEW NEUTRAL ALL ELSE INCLUDE
CEILINGS, STRUCTURE, AND DUCTWORK
GYM LOCKER ROOMS: PAINT ALL LOCKERS BLACK; ALL ELSE NEW NEUTRAL
ADD ONLY BLACK WAINSCOT AND GOLD STRIPE
REMOVE AND REINSTALL ACOUSTIC PANELS; TOP 3 FULL BLOCKS PAINT BLACK, GOLD, BLACK
ADD STRIPE @ TOP OF WALL - TOP HALF OF TOP BLOCK NEW NEUTRAL; BOTTOM HALF OF TOP BLOCK GOLD;
NEXT FULL BLOCK BLACK
REPAINT ALL TO MATCH EXISTING; STRIPES TO MATCH ALL; YELLOW CHANGE TO ACCENT 3; GREY WAINSCOT
= ACCENT 2; BLACK STRIPE CHANGE TO ACCENT 3
NEW NEUTRAL THROUGHOUT; COVER BLUE STRIPE; FIRST FIVE BLOCKS ACCENT 2; NEXT BLOCK ACCENT 3
AUDITORIUM: PAINT STAGE FLOOR BLACK – ENSURE PROPER PAINT AND PREP FOR COVERING WOOD FLOOR;
PAINT STAGE FRONT BLACK WHERE CARPETING CURRENTLY IS; MATCH EXISTING COLOR AND EXTENTS; TAN
CURVE @ GHS LETTERS CHANGE TO BLACK, PAINT AROUND LETTERS; PAINT BACK OF STAGE BLACK; PAINT SOFFT
@ ENTRY DOORS TO MATCH EXISTING; PAINT RAILING BLACK AT MEZZANINE
ACCENT WHERE SHOWN; OFFICES TO MATCH CLASSROOM WITH ACCENT ON WALL OPPOSITE DOOR
②① ALL NEUTRAL EXCEPT ISLAND TO BE ACCENT 1; 1 ½ STRIPE @ TOP OF ISLAND ACCENT 2
②② ACCENT 1 THROUGHOUT
②③ PAINT SMALL SOFFIT BLACK
Greer High School 2024 Paint Scope
Page 2
Athletic Wing
Fine Arts Wing
Greer High School 2024 Paint Scope
Page 3
MT Anderson 2024 Paint Scope – STORAGE ROOMS ONLY
Where applicable, repair all pre-cast joints, minor block joints and sheetrock cracks within painted areas. Patch
all holes without screws or hanging equipment.
Protect all murals unless otherwise noted.
Protect all promethean boards and parts. Do not disassemble any parts.
PAINT ALL PAINTABLE INTERIOR SURFACES, UNLESS OTHERWISE NOTED (EXCLUDE CEILINGS)
DO NOT PAINT HOLLOW METAL FRAMES AND DOORS
START AND STOP ALL ACCENT COLORS @ INSIDE CORNERS, UNLESS OTHERWISE NOTED
NEW NEUTRAL = SW 7668 MARCH WIND
ALL WALLS TO BE NEW NEUTRAL, UNLESS OTHERWISE NOTED
MT Anderson 2024 Paint Scope
Page 1
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >