Secondary Clarifier No. 4 Recoating
Agency: | City of Turlock |
---|---|
State: | California |
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD17105290891322103 |
Posted Date: | Mar 14, 2024 |
Due Date: | Apr 10, 2024 |
Source: | Members Only |
Secondary Clarifier No. 4 Recoating
The work consists, in general of: rehabilitating the Secondary Clarifier No. 4 at the Regional Water Quality Control Facility through means of abrasive blasting and installation of a high performance coating system and other associated work. The work also includes applying a coating system on all exterior surfaces of the Return Activated Sludge Pump Station above ground equipment. The work includes all necessary labor, materials, tools, equipment and any incidentals needed to perform the improvements as prescribed in these contract documents.
23-027 4/10/2024 $225,000.00 C33 $46.00 Janine Lee, 209-668-6035 jlee@turlock.ca.us
View planholders list Download specifications Print this project
The work consists, in general of: rehabilitating the Secondary Clarifier No. 4 at the Regional Water Quality Control Facility through means of abrasive blasting and installation of a high performance coating system and other associated work. The work also includes applying a coating system on all exterior surfaces of the Return Activated Sludge Pump Station above ground equipment. The work includes all necessary labor, materials, tools, equipment and any incidentals needed to perform the improvements as prescribed in these contract documents.
23-027 4/10/2024 $225,000.00 C33 $46.00 Janine Lee, 209-668-6035 jlee@turlock.ca.us
View planholders list Download specifications Print this project
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.