CMU 2803 Maverick Center Locker Room

Agency: Colorado Mesa University
State: Colorado
Level of Government: State & Local
Category:
  • 71 - Furniture
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD17145512734392096
Posted Date: Apr 19, 2024
Due Date: Apr 24, 2024
Source: Members Only

Attachment Preview

ADVERTISEMENT FOR BIDS
Design/Bid/Build
State of Colorado
Colorado Mesa University
Notice Number: CMU 2803
Project No: 1019-23-1
Project Title: Maverick Center
Locker Room Remodel
Estimated Construction Cost:
$147,000
Settlement Notice
For all projects with a total dollar value above $150,000 Notice of Final Settlement is
required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the
same location as the original solicitation.
Project Description
This project is to remodel the existing men’s and women’s shower areas in the locker rooms.
The tile, grout, walls, floors and fixtures have worn down over time and need to be removed and
replaced per the Construction Documents. Electrical requirements include upgrading lighting
within the area to LED fixtures as designed.
Scope of Services
General Contractor to facilitate demolition and renovation of existing recreation center locker
rooms within the Maverick Center.
Minimum Requirements
Notice is hereby given to all interested parties that all firms will be required to meet all minimum
requirements to be considered for this project. Interested bidders should be prepared to show
evidence of the following to be considered as qualified, as a minimum:
1. Provided General Contracting services within the last three (3) years for at least two (2) projects
each in excess of $ 100,000 (hard costs), utilizing the expertise present in their Colorado Office;
and
2. Demonstrated specific General Contracting experience in projects of similar scope and
complexity; and
3. Demonstrated bonding capability up to $ _147,000_ for an individual project coincidentally with
current and anticipated workloads; provide letter from surety that affirms this capacity.
Per C.R.S. §24-92-117, a public construction project in the amount of five hundred thousand
dollars or more shall be subject to the Buy Clean Colorado (BCCO) Act program requirements.
OSA-AFB-1
REV 1/2024
pg. 1
The BCCO Act requires the Office of the State Architect to establish a maximum acceptable global
warming potential (GWP) limit for each category of eligible materials, which include asphalt and
asphalt mixtures, cement and concrete mixtures, glass, post-tension steel, reinforcing steel,
structural steel, and wood structural elements. For any solicitation for a contract for the design of
an eligible project, a State Agency or institution shall require the designer who is awarded the
contract to include, in project specifications when final construction documents are released, a
current Environmental Product Declaration (EPD) that meets the maximum acceptable GWP
limits for each eligible material specified for the project. A contractor that is awarded a contract
for an eligible project shall not install any eligible materials on the project until the contractor
submits an EPD for each eligible material procured for the project.
Firms meeting the minimum requirements may obtain the bidding documents on the
website accompanying this advertisement.
Other Information
Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by
law.
Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of
Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.
Site Walk
A site walk will be held at:
Address: 1040 Mesa Ave
Grand Junction, CO 81501
Date/Time: 4/22/2024 at 11:00 am MST
Schedule/Submission Details
1. The schedule of events for the AFB process and an outline of the schedule for the balance of
the project is as follows:
Advertisement
Non-Mandatory Pre-Bid Site Visit
Date Email Questions Due
Date Email Answers Issued
Sealed Bids Due/Public Bid Opening
Negotiation of General Contractor Contract
Contract Approval (projected)
Anticipated Design Start
Anticipated General Contractor Start
Anticipated Construction Start/Finish
04/19/2024
11:00 AM MST 04/22/2024
04/23/2024 12 PM MST
04/23/2024
04/24/2024 11 AM MST
Est. Week of 04/25/2024
Est. Week of 05/03/2024
Not Applicable
05/20/2024
08/01/2024
OSA-AFB-1
REV 1/2024
pg. 2
2.Email questions are required to be submitted to:
Tracey Cornwell, Purchasing Specialist/Buyer
tcornwell@coloradomesa.edu
Comments:
Late sealed bids will be rejected without consideration. The Colorado Mesa
University and the State of Colorado assume no responsibility for costs
related to the preparation of submittals.
3. Submission: During the solicitation process for this RFP, all official communication between
the Purchasing Department and Offerors will be via postings on the Rocky Mountain E-
Purchasing System (RMEPS) website at: https://www.rockymountainbidsystem.com. The
RMEPS website offers both free and paid registration options that allow for full access of the
solicitation documents and for electronic submission of proposals. NOTE: Free registration on
the site may take up to 24 hours to process; plan registration to allow time for on-time
bid submission. The University does not have access or control of the vendor side of the
RMEPS site; contact RMEPS directly to resolve any issues encountered prior to response
deadline at (800) 835-4603.
The Purchasing Department will post notices which will include, but not be limited to, any
modifications to administrative or performance requirements, answers to inquiries received,
clarifications to requirements, and the announcement of the apparent winning Offeror. It is
incumbent upon Offerors to carefully and regularly monitor the RMEPS website for
any such postings.
The Purchasing Department will also post communications through the University Open
Solicitations website at: https://www.coloradomesa.edu/procurement-payment/open-
solicitations.html. Information on this website is for reference only; the RMEPS website is the
platform of record. It is incumbent that bidders review the University's Solicitation
Point of Contact/Clarification
Name:
Agency:
Phone:
Email:
Tracey Cornwell
Colorado Mesa University
970-248-1433
tcornwell@coloradomesa.edu
This Notice is also available on the web at:
https://www.rockymountainbidsystem.com
Media of Publication(s):
Publication Dates:
APPENDICES:
Appendix A: Information for Bidders (SBP-6.12)
Appendix B: Bid Form (SBP-6.13)
OSA-AFB-1
REV 1/2024
pg. 3
Appendix B1: Bid Alternates (SBP-6.131) (if Applicable)
Appendix B2: Unit Pricing (SBP-6.133) (if Applicable)
Appendix B3: Bid Bond (SBP-6.14) (if Applicable)
Appendix C: Sample: Direct Labor Burden Calculation (SBP-6.18)
Appendix D: Applicable Prevailing Wage and Apprenticeship and Fringe Rates (if
Applicable)
Appendix E: Sample: Apprenticeship Utilization Certifications (SBP-6.17) (if Applicable)
(Appendix F: Sample: SC6.21 and SC6.23 Design/Bid/Build Contractor’s Agreement and
General Conditions of the Contract)
OSA-AFB-1
REV 1/2024
pg. 4
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAMS
INFORMATION FOR BIDDERS
Institution or Agency: Colorado Mesa University
Project No./Name: 1019-12-1\Maverick Center Locker Room Remodel
1.
BID FORM: Bidders are required to use the Bid form attached to the bidding documents. Each bidder is required
to bid on all alternates and indicate the time from the date of the Notice to Proceed to Substantial Completion in
calendar days, and in addition, the bidder is required to indicate the period of time to finally complete the project
from Substantial Completion to Final Acceptance, also in calendar days. Bids indicating times for Substantial
Completion and Final Acceptance in excess of the number of days indicated in the Advertisement for Bids for
completion of the entire Project may be found non-responsive and may be rejected. The bid shall not be modified
or conditioned in any manner. Bids and applicable bid security shall be submitted in sealed envelopes bearing
the address and information shown below. If a bid is submitted by mail, this aforementioned sealed envelope
should be enclosed in an outer envelope and sent to the following addressee:
INSERT NAME OF AGENCY AND ADDRESS WHERE BID SHOULD BE DELIVERED
The outside of the sealed inner envelope should bear the following information:
Project #
Project Name
Name and Address of Bidder
Date of Opening
Time of Opening
2.
INCONSISTENCIES AND OMISSIONS: Bidders may request clarification of any seeming inconsistencies, or
matters seeming to require explanation, in the bidding documents at least three (3) business days prior to the
time set for the opening of Bids. Decisions of major importance on such matters will be issued in the form of
addendum.
3.
APPLICABLE LAWS AND REGULATIONS: The bidder’s attention is called to the fact that all work under this
Contract shall comply with the provisions of all state and local laws, approved state building codes, ordinances
and regulations which might in any manner affect the work to be done or those to be employed in or about the
work. Labor for work shall be governed by the provisions of Colorado law which are hereinafter set forth in
Articles 27 and 52 of the GENERAL CONDITIONS. This includes the requirements for apprenticeship and
prevailing wage on Public Projects. The bidder should be aware that reporting of embodied carbon emissions
of eligible materials shall be governed by the provisions of Colorado State Law. This includes the requirements
for Environmental Product Declarations (EPDs) that meet the maximum acceptable Global Warming Potential
(GWP) limits as established by the Office of the State Architect.
4.
BID SECURITY: A bid security of not less than 5% of the bid price is required when the price is estimated to be
$50,000 or more. The security shall be a bond by a surety company, the equivalent in cash, or otherwise supplied
in a form satisfactory for the State. Noncompliance requires the bid to be rejected as nonresponsive.
5.
TAXES: The bidder’s attention is called to the fact that the Bid submitted shall exclude all applicable federal
excise or manufacturers’ taxes and all state sales and use taxes as hereinafter set forth in Article 9.3 of the
GENERAL CONDITIONS.
6.
OR EQUAL: The words “OR EQUAL” are applicable to all specifications and drawings relating to materials or
equipment specified. Any material or equipment that will fully perform the duties specified, will be considered
SBP-6.12
Rev. 01/2024
Page 1 of 2
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >