The project includes drilling, testing, and inspecting four (4) new alluvial wells
including casing, well pumps, well meter vaults, electrical panels, pitless adapters,
vents, and concrete pads around wells. Wells will be connected with 4-inch and 6-inch
pipe to convey water to an existing 12-inch waterline. The installation of the wells will
require installation of new conduit and electrical and instrumentation conduits from
the existing Yampa River Water Treatment Plant, directionally drilled under the
Yampa River, and trenched to the City’s Infiltration Gallery C.