Sawgrass to Seagrass Center

Agency: City of Deerfield Beach
State: Florida
Level of Government: State & Local
Category:
  • F - Natural Resources and Conservation Services
Opps ID: NBD17285429144988482
Posted Date: Apr 22, 2024
Due Date: May 2, 2024
Solicitation No: 24-10-PC
Source: Members Only

Bid Information



Type
Invitation to Bid (Construction)
Status
Issued
Number
24-10-PC Addendum 1 (Sawgrass to Seagrass Center)
Issue Date & Time
3/6/2024 11:23:19 PM (ET)
Close Date & Time
5/2/2024 02:00:00 PM (ET)
Time Left
9 days 17 hours 22 minutes 17 seconds
Notes
The City of Deerfield Beach is soliciting sealed responses from qualified vendors for the Sawgrass to Seagrass Center i n accordance with the terms, conditions, scope of work, technical specifications, and plans of the above mentioned Invitation to Bid - Construction.

Contact Information
Name
Paul Collette, Senior Buyer
Address
401 SW 4th Street
Deerfield Beach, FL 33441 USA
Phone
(954) 480-4418
Fax
Email




Bid Documents







Document name Format


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



1 items in 1 pages

Bid Invitation (please login to view this document)

Acrobat / PDF


Bid Attachments





















File Name Description File Size


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



40 items in 3 pages

24-10-PC Invitation to Bid Package.pdf (please login to view this document)
Invitation to Bid Package 334 KB

24-10-PC Exhibit I - Tentative Schedule of Events (Part of Addendum 1).lsx.pdf (please login to view this document)
Exhibit I - Tentative Schedule of Events (Part of Addendum 1) 43 KB

24-10-PC Exhibit II - Project Manual - Technical Specs Vol. I of II (Part of Addendum 1).pdf (please login to view this document)
Exhibit II - Project Manual - Technical Specifications Vol. I of II (Part of Addendum 1) 6.47 MB

24-10-PC Exhibit III - Project Manual - Technical Specs Vol. II of II (Part of Addendum 1).pdf (please login to view this document)
Exhibit III - Project Manual - Technical Specifications Vol. II of II (Part of Addendum 1) 6.44 MB

24-10-PC Exhibit IV - PLANS STS - ARCHITECT SET (Part of Addendum 1).pdf (please login to view this document)
Exhibit IV - PLANS STS - ARCHITECT SET (Part of Addendum 1) 24.59 MB

24-10-PC Exhibit V - PLANS STS - CIVIL SET (Part of Addendum 1).pdf (please login to view this document)
Exhibit V - PLANS STS - CIVIL SET (Part of Addendum 1) 15.71 MB

24-10-PC Exhibit VI - PLANS STS - ELECTRICAL SET (Part of Addendum 1).pdf (please login to view this document)
Exhibit VI - PLANS STS - ELECTRICAL SET (Part of Addendum 1) 3.16 MB

24-10-PC Exhibit VII - PLANS STS - FIRE ALARM SET.pdf (please login to view this document)
Exhibit VII - PLANS STS - FIRE ALARM SET 993 KB

24-10-PC Exhibit VIII - PLANS STS - FIRE PROTECTION SET.pdf (please login to view this document)
Exhibit VIII - PLANS STS - FIRE PROTECTION SET 1.47 MB

24-10-PC Exhibit IX - PLANS STS - LANDSCAPE SET (Part of Addendum 1).pdf (please login to view this document)
Exhibit IX - PLANS STS - LANDSCAPE SET (Part of Addendum 1) 9.57 MB

24-10-PC Exhibit X - PLANS STS - LOW-VOLTAGE SET (Part of Addendum 1).pdf (please login to view this document)
Exhibit X - PLANS STS - LOW-VOLTAGE SET (Part of Addendum 1) 1.38 MB

24-10-PC Exhibit XI - PLANS STS - MECHANICAL SET (Part of Addendum 1).pdf (please login to view this document)
Exhibit XI - PLANS STS - MECHANICAL SET (Part of Addendum 1) 3.48 MB

24-10-PC Exhibit XII - PLANS STS - PLUMBING SET (Part of Addendum 1).pdf (please login to view this document)
Exhibit XII - PLANS STS - PLUMBING SET (Part of Addendum 1) 11.86 MB

24-10-PC Exhibit XIII - PLANS STS - STRUCTURAL SET.pdf (please login to view this document)
Exhibit XIII - PLANS STS - STRUCTURAL SET 11.94 MB

24-10-PC Exhibit XIV - PLANS STS - SURVEY.pdf (please login to view this document)
Exhibit XIV - PLANS STS - SURVEY 1.01 MB



Bid Questions
















Question
Page 11, Item 9 of Attachment G to the ITBC states that bidders are to provide a full list of Subcontractors as part of the response. However, Subcontracts typically are not finalized, negotiated, or awarded until after the GC is awarded the Project, therefore we would not have any specific subcontracts in place to list at the time of bid. As an alternative, will the CRA accept a list of proposed subcontractors for review and approval at a predetermined timeframe after award?
Answer Please see revised Attachment G under "Attachment" tab
Submitted 4/9/2024 04:19:27 PM (ET)


Question
What evaluation method will be used for the award of this contract?
Competitive solicitation awarded to the responsive, responsible bidder with the lowest price bid?
or
Competitive solicitations where objective factors (evaluation of criteria, including and beyond price, is the determining factor for award) will be used and bidders are assigned point totals?
If the latter, please provide the point /category breakdowns.
Answer The recommendation for award will be made to the lowest responsive and responsible bidder.
Submitted 4/9/2024 03:52:05 PM (ET)


Question
Is there an asbestos survey available?
Answer Yes, asbestos survey will be provided.
Submitted 4/9/2024 02:10:42 PM (ET)


Question
Is Lightweight Insulating Concrete an acceptable alternative to PolyIso Insulation?
Answer No, LWIC is not acceptable. Tapered insulation was calculated in the structural analysis.
Submitted 4/9/2024 12:56:33 PM (ET)


Question
Are there any more interior elevation drawings for the reception desk on the parking level. It shows details on sheet A503 details 1-7 but it does not clearly show drawer locations. Please advise.
Answer Millwork elevations 4 and 5 for the reception desk will be updated to depict the exact configuration of the drawings and shelves as indicated in the details.
Submitted 4/9/2024 11:58:07 AM (ET)


Question
Will the concrete stairs require Penetron admixture or penetrating sealer?
Answer All exposed concrete areas which are not under air-conditioned space will require the inclusion of penetron admixture in the mix design.
Submitted 4/9/2024 11:41:45 AM (ET)


Question
Will the roof area on S203 require either Penetron admixture or penetrating sealer if it is to be covered by roof membrane?
Answer No, roof area will not require the inclusion of penetron admixture.
Submitted 4/9/2024 11:41:40 AM (ET)


Question
Will the second-floor terrace on S202 require Penetron admixture or penetrating sealer?
Answer All exposed concrete areas which are not under air-conditioned space will require the inclusion of penetron admixture in the mix design.
Submitted 4/9/2024 11:41:33 AM (ET)


Question
Please confirm that the rebar at the 2nd level terrace is galvanized not MMFX as per Structural Note on S000.
Answer Galvanized rebar in lieu of MMFX is structurally acceptable to be used in the project.
Submitted 4/9/2024 11:33:19 AM (ET)


Question
As of this morning it appears that none of the RFI’s submitted since the Pre-bid conference have been responded to, nor have the revised plans discussed at the pre-bid been issued. Will the bid date be extended?
Answer Any updates related to this project will be announced through E-Procurement Marketplace.
Submitted 4/9/2024 11:05:02 AM (ET)

Items 1 - 10 shown of 113 • Page 1 of 11 shown

First 1 2 3 4 5 ... > Last




TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >