March 20, 2024
City of Pawtucket, RI
***** Addendum #2 *****
RFP # 24-028
Gateway Signage Project
The attention of bidders submitting proposals for the above-referenced project is called
to the following Addendum to the Request for Proposals indicated above. The items set
forth herein, whether of omission, addition, substitution or other change, are all to be
included in, and form a part of the proposed Contract Documents for the work.
Inclusion of this Addendum must be acknowledged in the spaces provided in the
document entitled “Request for Proposals RFP #24-028 – Gateway Signage Project.”
Failure to acknowledge any and all addenda in the above specified bid form may be
cause for rejection of the bids by the Owner on the grounds that it is not responsive.
This Addendum consists of Amended Appendix C
ADDENDUM ITEMS
1. CHANGES TO RFP LANGUAGE
ITEM 1: General Wage Rate Decision (Appendix C of RFP)
DELETE: Appendix C
INSERT:
Appendix C REV1 - Attached General Wage Rate
Decision Modification #3 Dated 3/8/2024
Eric Hammerschlag
Eric Hammerschlag
City Engineer
Appendix C REV1 3/20/24
General Wage Rate Decision
Davis Bacon
The current wage determination (Heavy Construction, Providence County), as obtained from the
Rhode Island Department of Labor and Training on today’s date, is bound as part of this Project
Manual.
Wage Decision Obtained on 03/18/2024 from SAM.gov
"General Decision Number: RI20240001 03/08/2024 Modification #3
Superseded General Decision Number: RI20230001
State: Rhode Island
Construction Types: Building, Heavy (Heavy and Marine) and
Highway
"General Decision Number: RI20240001 03/08/2024
Superseded General Decision Number: RI20230001
State: Rhode Island
Construction Types: Building, Heavy (Heavy and Marine) and
Highway
Counties: Rhode Island Statewide.
BUILDING CONSTRUCTION PROJECTS (does not include residential
construction consisting of single family homes and apartments
up to and including 4 stories) HEAVY, HIGHWAY AND MARINE
CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally
required to pay at least the applicable minimum wage rate
required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered
contracts entered into by the federal government that are
subject to the Davis-Bacon Act itself, but do not apply to
contracts subject only to the Davis-Bacon Related Acts,
including those set forth at 29 CFR 5.1(a)(1).
______________________________________________________________
|If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the |
|2022, or the contract is | contract.
|
|renewed or extended (e.g., an |. The contractor must pay |
|option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $17.20 per hour (or |
|
| the applicable wage rate |
|
| listed on this wage |
|
| determination, if it is |
|
| higher) for all hours |
|
| spent performing on the |
|
| contract in 2024. |
|______________________________|_____________________________|
|If the contract was awarded on|. Executive Order 13658 |
|or between January 1, 2015 and| generally applies to the |
|January 29, 2022, and the | contract.
|
|contract is not renewed or |. The contractor must pay all|
|extended on or after January | covered workers at least |
|30, 2022:
| $12.90 per hour (or the |
|
| applicable wage rate listed|
|
| on this wage determination,|
|
| if it is higher) for all |
|
| hours spent performing on |
|
| that contract in 2024. |
|______________________________|_____________________________|
The applicable Executive Order minimum wage rate will be
adjusted annually. If this contract is covered by one of the
Executive Orders and a classification considered necessary for
performance of work on the contract does not appear on this
wage determination, the contractor must still submit a
conformance request.
Additional information on contractor requirements and worker
protections under the Executive Orders is available at
http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0
01/05/2024
1
01/12/2024
2
02/23/2024
3
03/08/2024
ASBE0006-006 09/01/2023
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(Includes preparation,
wetting, stripping, removal
scrapping, vacuuming, bagging
& disposing of all insulation
materials, whether they
contain asbestos or not, from
mechanical systems)..............$ 48.15
34.84
----------------------------------------------------------------
ASBE0006-008 09/01/2023
Rates Fringes
Asbestos Worker/Insulator
Includes application of
all insulating materials,
protective coverings,
coatings & finishes to all
types of mechanical systems.$ 48.15
34.84
----------------------------------------------------------------
BOIL0029-001 01/01/2021
Rates Fringes
BOILERMAKER......................$ 45.87
29.02
----------------------------------------------------------------
BRRI0003-001 06/01/2022
Rates Fringes
Bricklayer, Stonemason,
Pointer, Caulker & Cleaner.......$ 46.86
29.14
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >