Chilhowee View Road Water Main Improvements Addendum 3

Agency: County of Blount
State: Tennessee
Level of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD17594489416204821
Posted Date: Sep 25, 2023
Due Date: Sep 27, 2023
Solicitation No: 2023-0189
Source: Members Only

Bid Information



Type
Invitation to Bid
Status
Issued
Number
2023-0189 Addendum 3 (Chilhowee View Road Water Main Improvements)
Issue Date & Time
9/1/2023 04:22:44 PM (ET)
Close Date & Time
9/27/2023 01:30:00 PM (ET)
Time Left
1 days 18 hours 13 minutes 16 seconds
Notes
It is the intent of this Invitation to Bid (ITB) to procure a contract for Construction of the Chilhowee View Road Water Main Improvements. The Project consists of constructing approximately 10,100 linear feet (LF) of 12” DIP water line, 7,050 LF of 8” PVC water line, 2,175 LF of 6” PVC water line, 130 LF of 4” PVC water line, 10 LF of 2” PVC water line, all service reconnections, and all associated valves, fittings, and appurtenances along Chilhowee View Road, from Wilkinson Pike to Whites Mill Road, and along Nickel Point Drive, and along E. Lamar Alexander Highway (US-321) from Autumn Drive to Sims Road in Maryville, TN. Bids shall be on a unit price basis for a single prime Contract.


The Bid Invitation and all Bid Attachments may be obtained through Blount County's online bidding system at https://blounttn.ionwave.net/login.aspx . If not currently registered with Blount County, v endors are encouraged to register under the Supplier Registration tab and submit their response through the online bidding system at this same link. Manual (hard copy) bid responses are acceptable. If submitting a hard copy bid response, it shall be submitted at the South Blount County Utility District, 320 Partnership Parkway, Maryville, TN 37801. Bid respo nses, whether electronic or manual (hard copy) submissions, must contain all required information and documentation including, but not limited to, Response Attachments, Bid Attributes, and Bid Lines and be submitted no later than the Response Deadline. Bid responses are not accepted via email or facsimile. Bidders must allow ample time to submit their response. The system does not allow entries beyond the Response Deadline Date/Time.


SEE THE ATTRIBUTES TAB FOR THE LINK TO THE PROJECT MANUAL AND BID DRAWINGS.



If you have any issues registering in the online system, contact the IonWave help desk at 866-277-2645 ext. 4, support@ionwave.net or Blount County Purchasing, 865-273-5740, purchasing@blounttn.org .


When registered, vendors may submit questions via the Questions tab for this ITB in the online bidding system. Please make note of the question deadline. Prior to bid submission, it is the bidder's responsibility to access the online bidding system and ascertain they have received any addenda and viewed answers to published questions and bid accordingly.


Pre-bid Meeting: A non-mandatory on-site Pre-Bid Meeting will be held on Tuesday, September 12, 2023 at 10:00 a.m. ET, at the South Blount County Utility District, 320 Partnership Parkway, Maryville, TN 37801.


Bid Opening: The public Bid Opening will be held at the response submittal deadline at South Blount County Utility District, 320 Partnership Parkway, Maryville, TN 37801, and attendance is optional. The opening may also be accessed via Zoom at https://us06web.zoom.us/j/8101028314, meeting ID 810 102 8314 . Bidders shall access the online bidding system for possible extension of this date and time. If you have problems accessing the meeting, please phone Blount County Purchasing, 865-273-5740.



Contact Information
Name
Lisa Dyring, Buyer
Address
385 Court Street
Maryville, TN 378045906 USA
Phone
(865) 273-5742
Fax
(865) 273-5746
Email
ldyring@blounttn.org




Bid Documents








Document name Format


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



2 items in 1 pages

Bid Invitation

Acrobat / PDF

Public Question & Answer

Acrobat / PDF


Bid Attachments





















File Name Description File Size


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



15 items in 1 pages

Addendum 3 - 2023-09-25 Chilhowee View Water Main - 2023-0189.pdf
Addendum 3 - Questions Answered & Revisions - 2023-09-25 Chilhowee View Water Main 6.29 MB

Addendum 3 - ITB 2023-0189 - 00410 - C-410 Bid Form 2013_REV_ADD3.pdf
Addendum 3 - ITB 2023-0189 - 00410 - C-410 Bid Form 2013_REV 277 KB

Addendum 2 - 2023-09-12_Pre-Bid_Minutes_Chilhowee.pdf
Pre-Bid Meeting Minutes 9.12.23 203 KB

Addendum 2 - Pre-bid Meeting Attendance Sheet ITB 2023-0189.pdf
Pre-bid Meeting Attendance Sheet 9.12.23 98 KB

Contractor License Information Page.pdf
Contractor License Information 67 KB

Business Tax License Affidavit.pdf
Business Tax & License Affidavit 41 KB

Blount County Special Provisions - Bid 2023-0189.pdf
Special Provisions 832 KB

Blount County Terms & Conditions - Bid 2023-0189.pdf
Terms & Conditions 756 KB

Blount County Forms - Sign - ITB 2023-0189.pdf
Load the documents as one attachment on the Response Attachments tab after signing and notarizing where requested. Forms must include: Byrd Anti-Lobbying Form, Conflict of Interest, Debarment Form, Drug Free Workplace, Iran Divestment, Non-boycott of Israel, and Non-collusion Form. 1.17 MB

Federal Contract Provisions - ITB 2023-0189.pdf
Federal Contract Provisions

**NOTE - Davis-Bacon only applies to ARPA-funded projects over Ten Million Dollars ($10,000,000)
711 KB

Certification_Regarding_Debarment_-_Lower_Tier_Covered_Transactions.pdf
Debarment Certification signature form for GC to provide to Lower Tier contractors - to keep on file 662 KB

Title VI Form.pdf
Title VI Form 125 KB

W-9 Form.pdf
W-9 Form 130 KB

COI const-install floater sample- BCG S. Blount.pdf
Sample COI 184 KB

Addendum 3 - ITB 2023-0189 Bid Summary for Manual Bid Submission Only.pdf
Bid Summary for Manual Bid Submission Only - This is a required document for manual submission. All required documents on the Response Attachments tab must be included with a manual bid submission, with the completed Bid Cover & License Page on the outside of the sealed bid envelope and submitted by the bid deadline. All bid documents must be read and acknowledged in the Attributes section. 127 KB



Bid Questions














Question
So the directional bore you want Fusible C900-don’t see that on the plans or bid form
Answer Section 02723 Fusible PVC Pipe is included as part of the Owner’s standard specifications.

However, no fusible PVC is noted on the plans or bid form.
Submitted 9/25/2023 09:04:56 AM (ET)


Question
3. - the Inset don't match up, there is no #5 on bid form and some are doubled up
Answer Inset #5 is not listed as a pay item on the bid form because it is not a connection to an existing

water main. Pay Item 208 Tie-ins to Existing Facilities is meant for payment when connecting to

existing lines only. Insets are shown at a 1” to 10’ scale to indicate detail on certain work areas, but not

all insets represent connections to existing water mains.
Submitted 9/19/2023 01:49:25 PM (ET)


Question
2. -Domestic Preference - so you want Buy America or BABA
Answer
ARPA funding does not state a requirement for Buy America or Build America, Buy America

(BABA). ARPA funding only has a requirement for Domestic Preference § 200.322, and

those requirements are listed in the "Federal Contract Provisions" document on the "Attachments" tab

of this online Bid.

Appendix II to Part 200 – Contract Provisions for Non-Federal Entity Contracts Under Federal Awards

Submitted 9/19/2023 01:46:39 PM (ET)


Question
1. - do they still want the AFC B84B fire hydrants?
Answer Section 02640, Paragraph 2.8 gives the requirements for fire hydrants. The question refers to

American Flow Control/American-Darling 5-1/4” B-84-B. The Engineer will review any fire hydrant

submittal from American-Darling or other approved manufacturers for compliance with the specs.

Fire hydrants that meet the requirements, including from an Owner-approved manufacturer, shall be

allowed. Section 02640 Paragraph 2.8.H for Owner-approved manufacturers is modified by this

addendum under Item No. 5 Modifications.
Submitted 9/19/2023 01:45:20 PM (ET)


Question
Will the contractor be responsible for all of the cost incurred, by of all the items listed on the easement notes even if part of the waterline can be installed without interfering with certain trees and item noted?
Answer All items noted on the easement information forms shall be considered requirements of the

contract. Items listed were discussed during easement negotiations with homeowners, and the noted

easement work was agreed to in order to gain homeowner approval. Regarding trees specifically,

contractor shall remove trees per the easement instructions. If any trees are not listed as to be

removed, the contractor shall make all efforts to protect and maintain the trees
Submitted 9/18/2023 08:38:05 AM (ET)


Question
If there is a portion of the main line or service line that cannot be located, who will be responsible for completing the repairs if either should be broken?
Answer The contractor will be responsible for all repairs to existing main lines or service lines that are

broken by the contractor during construction.
Submitted 9/18/2023 08:32:53 AM (ET)


Question
Is there any portion of this project that has any main line or service line that can't be located once a TN One Call is placed?
Answer Neither the A.C. nor PVC water lines have tracer wire. Some service lines are believed to be

copper and are believed to be locatable. Utility staff have visually located these water mains in

multiple areas during regular maintenance work, service connections, and repairs on these lines in

previous years. The utility will respond to all TN One Call locates to mark mains and services.
Submitted 9/18/2023 08:30:41 AM (ET)


Question
Is both the A.C. Line and the PVC Line in service, in the area that has two lines indicated on the drawings?
Answer Neither the A.C. nor PVC water lines have tracer wire, but utility staff have visually located these

water mains in multiple areas during regular maintenance work, service connections, and repairs on

these lines. The utility will respond to all TN One Call locates.
Submitted 9/18/2023 08:29:08 AM (ET)







Bid Event Non-Participation Activity









Activity Date Activity Name Description


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 20
  • 50



3 items in 1 pages
9/12/2023 10:00:00 AM (ET)
Non-mandatory Pre-bid Meeting - ITB 2023-0189
Pre-bid Meeting: A non-mandatory on-site Pre-Bid Meeting will be held on Tuesday, September 12, 2023 at 10:00 a.m. ET , at the South Blount County Utility District, 320 Partnership Parkway, Maryville, TN 37801.
9/19/2023 05:00:00 PM (ET)
Questions Due
Questions may be submitted via the Questions tab in IonWave, and are due before 5:00 p.m. ET on Tuesday, September 19, 2023.
9/27/2023 01:30:00 PM (ET)
Bid Opening for ITB 2023-0189
The public bid opening will be held at the response submittal deadline at South Blount County Utility District, 320 Partnership Parkway, Maryville, TN 37801. The opening may also be accessed via Zoom at: https://us06web.zoom.us/j/8101028314, meeting ID 810 102 8314.


Attendance is optional.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >