Bonneville Pump Station Replacement

Agency: Nevada Government eMarketplace (NGEM)
State: Nevada
Level of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD18750150347198304
Posted Date: Feb 8, 2024
Due Date: Mar 6, 2024
Solicitation No: 22.MWA470-DD REV
Source: Members Only

Bid Information



Type
Invitation for Bid
Status
Issued
Number
22.MWA470-DD REV (Bonneville Pump Station Replacement)
Issue Date & Time
2/8/2024 04:08:05 PM (PT)
Close Date & Time
3/6/2024 01:30:00 PM (PT)
Time Left
26 days 17 hours 36 minutes 14 seconds
Notes
The City of Las Vegas (Owner) hereby invites qualified firms or individuals (Bidders) to submit Bids for full removal and replacement of the Bonneville Pump Station wet well structure.

PWP No: CL-2023-312 Estimate: 7,460,900 - $9,118,840.

Persons with a disability may request accommodations or assistance to participate in the solicitation process by contacting Purchasing & Contracts at 702-229-6231 or 7-1-1 (TTY). To insure the City is able to meet your needs, please submit requests at least 2 business days in advance.

Contact Information
Name
Dan Dixon
Address
495 South Main Street
Las Vegas, NV 89101 USA
Phone
1 (702) 229-6173
Fax
1 (702) 464-2575
Email
ddixon@lasvegasnevada.gov





Bid Attachments





















File Name Description File Size


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



15 items in 1 pages

ITB Instructions Offsite - updated 1-25-24.pdf (please login to view this document)
Instructions to Bidders for submitting a Response to this Invitation to Bid. 1.67 MB

22.MWA470-DD REV Contract_OffSite 2-8-24.pdf (please login to view this document)
Terms, conditions and specifications that will govern any contract resulting from this solicitation. 1.18 MB

22.MWA470-DD REV Special Provisions Bonneville Pump Station Replacement-.pdf (please login to view this document)
Written descriptions of the requirements for the Work, to be incorporated as a part of the Contract 61.48 MB

22.MWA470-DD REV Plan Sheet Index Bonneville Pump Station Replacement-.pdf (please login to view this document)
A list of the project Plans included in Exhibit D, to be incorporated as a part of the Contract 310 KB

22.MWA470-DD REV Plans-01 GENERAL Bonneville Pump Station Replacement-Plans-01 GENERAL.pdf (please login to view this document)
Plan 1 Diagrammatic representations of the requirements for construction of the Work, to be incorporated as a part of the Contract. 12.66 MB

22.MWA470-DD REV Plans-02 DEMOLITION Bonneville Pump Station Replacement-.pdf (please login to view this document)
Plan 2 Diagrammatic representations of the requirements for construction of the Work, to be incorporated as a part of the Contract. 5.78 MB

22.MWA470-DD REV Plans-03 CIVIL Bonneville Pump Station Replacement-.pdf (please login to view this document)
Plan 3 Diagrammatic representations of the requirements for construction of the Work, to be incorporated as a part of the Contract. 14.62 MB

22.MWA470-DD REV Plans-04 STRUCTURAL Bonneville Pump Station Replacement-.pdf (please login to view this document)
Plan 4 Diagrammatic representations of the requirements for construction of the Work, to be incorporated as a part of the Contract. 19.94 MB

22.MWA470-DD REV Plans-05 MECHANICAL Bonneville Pump Station Replacement-.pdf (please login to view this document)
Plan 5 Diagrammatic representations of the requirements for construction of the Work, to be incorporated as a part of the Contract. 6.46 MB

22.MWA470-DD REV Plans-06 ELECTRICAL Bonneville Pump Station Replacement-.pdf (please login to view this document)
Plan 6 Diagrammatic representations of the requirements for construction of the Work, to be incorporated as a part of the Contract. 31.69 MB

22.MWA470-DD REV Plans-07 INSTRUMENTATION Bonneville Pump Station Replacement-.pdf (please login to view this document)
Plan 7 Diagrammatic representations of the requirements for construction of the Work, to be incorporated as a part of the Contract. 15.21 MB

RESPONSE_ATTACHMENTS_Req_1.1 with_Offsite_Bid (1).pdf (please login to view this document)
Attachments 1.1 through 1.3, which must be submitted WITH THE BID. See ITB 6 of the ITB Instructions for more information on this requirement. DOWNLOAD AND SAVE these Attachments prior to completing and uploading to the Response Attachments Tab. 1.64 MB

RESPONSE_ATTACHMENTS_Req_WITHIN_2_HRS (5).pdf (please login to view this document)
Attachments 2.1 and 2.2, which must be submitted by the 3 Low Bidders WITHIN 2 HOURS of completion of Bid opening. See ITB 7 for more information on this requirement. DOWNLOAD and SAVE these attachments prior to completing this form. 1.33 MB

RESPONSE_ATTACHMENTS_Req_WITHIN_1_DAY_NGEM_Offsite 2-8-24.pdf (please login to view this document)
Attachments 3.1 & 3.2, which must be submitted by the 3 Low Bidders WITHIN 1 BUSINESS DAY of completion of Bid opening. See ITB 8 for more information on this requirement. DOWNLOAD and SAVE these attachments prior to completing this form. 698 KB

RESPONSE_ATTACHMENTS_3.4_WITHIN_1DAY_Bypass_Pumping.pdf (please login to view this document)
Attachment 3.4 which must be submitted by the 3 Low Bidders WITHIN 1 BUSINESS DAY of completion of Bid opening. See ITB 8 for more information on this requirement. DOWNLOAD and SAVE these attachments prior to completing this form. 904 KB


TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >