Boston School - Hurricane Repairs, HL-748-01 ADDENDUM#2

Agency: Calcasieu Parish School
State: Louisiana
Level of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD18797870404180236
Posted Date: Apr 18, 2024
Due Date: Apr 23, 2024
Solicitation No: HL-748-01
Source: Members Only

Attachment Preview

April 18, 2024
GRACE HEBERT CURTIS ARCHITECTS, LLC | 3100 RYAN STREET | SUITE C | LAKE CHARLES, LOUISIANA 70601
ADDENDUM 002
TO ALL CONTRACTORS:
This Addendum is hereby made a part of the Contract Documents dated March 8, 2024.
CPSB Lake Charles Boston School - Hurricane Repairs, HL-748-01
Lake Charles, Louisiana 70601
GHC Project No. 3220119
The following items shall be considered part of the contract documents and shall be included in the same
when Construction Contract is executed. Changes made by Addenda shall take precedence over
Original Documents. Any changes, which may affect construction or proper installation of materials,
equipment or fixtures, not specifically mentioned in this addendum, shall be brought to the attention of
Designer before submitting bid. Otherwise, such conditions, if found later to exist, must be worked out in
an acceptable manner without additional cost to the Owner. Prime Contractors are hereby advised to call
attention of all subcontractors to changes, which may affect their work.
GENERAL
GENERAL:
1. The Contractor shall be responsible for moving all furniture from work areas to a temporary
storage location on site as designated by the Owner and back to the original space upon
completion of the work area, unless otherwise noted to be relocated to a different space.
Contractor shall be responsible for the protection of all components throughout the moves and
responsible for replacement of any damaged furniture or components with equal and matching
products. Contractor shall label all items to be relocated from their original space and shall
document condition with photographs. Should Contractor encounter any existing damage, this
shall be noted prior to relocating the item from the space.
2. Contractor shall notify the Architect and coordinate with the Owner for content manipulation or
relocation of any computer equipment or IT related items. This includes classroom content such
as Robotics components.
3. Summer Camp Schedule – Contractor is to be aware that there will be several summer camps
with student attendance hosted at the project site. Contractor is to keep all construction areas
properly secured and separated from students at all times, throughout the duration of
construction. Please see below for dates of summer camps provided by the owner:
Vex Robotics Camp: June 3 thru 7
AI Energy Camp: June 10 thru 14
Careers in STEM Camp; June 10 thru 14
Future Engineers Camp: June 17 thru 21
NASA Astro Camp: July 22 thru 26
Contractor will be required to coordinate with owner’s representatives during construction to
account for summer camp student activities.
4. The Owner has released a separate project for bid for the asbestos abatement for Lake Charles
Boston School. The Contractor shall coordinate with the Owner’s Selected Abatement Contractor
throughout construction to ensure no schedule conflicts and safety of all construction personnel.
ADDENDUM NUMBER TWO
1
RFIS
1. Question: Sheet A402 not included with drawings
Answer: There is no Sheet A402 in the Drawings. References to this sheet have been removed.
2. Question: Sheet A151.C - Note R42 - Note mentions to demo to Tectum and Gyp Deck, which
deck type is existing?
Answer: The location for Note R42 is an existing Tectum Deck.
3. Question: New door hardware to be specified, Door A140 removed from scope Sheet / no
hardware spec section.
Answer: The Door Hardware Specification 08 7100 is attached with this Addendum.
4. Question: There is a Spec Section for Flagpole but cannot find its location on Drawings.
Answer: The flag pole is no longer in the scope of the project. Delete Flagpole spec.
5. Question: Sheet S100 - Detail B - Which metal wall panel system is this referring to?
Answer: The material should be the Kal Wall System. Refer to Architectural wall sections for this
location.
6. Question: Could you provide ceiling heights on the RCP Drawings?
Answer: See attached revised sheets.
7. Question: Note A07 on Architectural Drawings says to paint wall section, will the entire room
need to be painted or only the walls indicated by the arrows for note A07?
Answer: Only the walls indicated by the arrows for Note A07 shall receive the new painted finish.
8. Question: Sheet A101.B - Note A51 - Is the contractor responsible for storage or will the items be
turned over to owner for storage?
Answer: The Owner will provide a location on site to store the furniture, however the Contractor
shall be responsible for the relocation of the furniture from Building F to the temporary storage
location and back as indicated in Note A51.
9. Question: Is the contractor responsible for storage of the disassembled bleacher system while the
gym floor is being installed?
Answer: Yes, it shall be the Contractor’s means and methods on whether the bleacher
components can remain within the Gym during the flooring installation or whether they feel they
should be removed from the space and stored separately. Should they be removed, Contractor
shall provide secured and insured space for storage.
10. Question: Clarification: Should our base bid price include the demo and replacement of the metal
decks as noted in the drawings and the unit price is in place in the event of more or less being
required?
Answer: Yes
11. Question: Clarification: All unit price descriptions note that they are to be provided in base bid.
Are we to total the sum of all 4 unit price extensions and add them to our base bid total?
Answer: Yes, all unit price extensions shall be included in the total base bid on the bid form.
12. Question: Is there a specific size, quantity, and style of benches the customer is looking for?
What kind of hydroponic system is the customer looking for?
Answer: The hydroponic system is removed from the scope of work. The benches for the
greenhouse shall also be removed from the scope of work.
13. Question: Can we get a spec on the greenhouse hydroponic system? What type of system is
to be used?
Answer: The hydroponic system is removed from the scope of work.
ADDENDUM NUMBER TWO
2
14. Question: Can we get a spec of clarification on the type of benches required in the
greenhouse? Sizing? Quantity?
Answer: The benches for the greenhouse shall be removed from the scope of work.
15. Question: We have not seen an addendum with the pre-scheduled dates and times for site
visits, being that today is the last day for RFIs will we be able to send RFIs discovered during
the site visits?
Answer: See Addendum 1 which provided dates for bidders to visit the site. Additional contractor
visits outside of these pre-scheduled times may be coordinated with the Owners staff at the front
desk, pending there is no interruption to campus operations.
16. Question: Note S07 on sheet AS100 states greenhouse will require perimeter footing, however
there is a drawing sheet for the greenhouse foundation including a slab, will the greenhouse
require only a perimeter footing or the entire foundation in the drawings?
Answer: The greenhouse shall have an entire slab as detailed on Sheet S102.
17. Question: The owner's abatement contractor mentioned in the Pre Bid that a portion of his
scope would be added to this project. Can we get a clarification on which portion? Will any
abatement be required in the bid for this project?
Answer: The abatement scope is being bid separately from this scope of work.
18. Question: Will there be any additional steel support required for the translucent wall panels to
be installed on the library?
Answer: Translucent wall panels are to be installed as required by the manufacturer’s written
requirements.
19. Question: Will the repointing of the glass block system be required on interior and exterior of
each location noted on the elevation drawings?
Answer: Extents of repointing shall be as required by the glass block manufacturer’s written
requirements.
ARCHITECTURAL
DRAWINGS
1. Add attached Sheet SK-001 Reflected Ceiling Plan - Fixtures.
2. Add attached Sheet SK-002 Reflected Ceiling Plan - Fixtures.
3. Sheet G006 Schedules & Interior Details: Replace Sheet G006 Schedules & Interior Details with
the attached Sheet G006 Schedules & Interior Details.
4. Add Sheet AS100.1 Phasing Plan.
5. Sheet A101 Architectural 1st Floor Plan - Overall: Replace Sheet A101 Architectural 1st Floor
Plan - Overall with the attached Sheet A101 Architectural 1st Floor Plan - Overall.
6. Sheet A101.A1 Architectural 1st Floor Plan – Building A, Sector 1: Replace Sheet A101.A1
Architectural 1st Floor Plan – Building A, Sector 1 with the attached Sheet A101.A1 Architectural
1st Floor Plan – Building A, Sector 1
7. Sheet A101.A2 Architectural 1st Floor Plan – Building A, Sector 2: Replace Sheet A101.A2
Architectural 1st Floor Plan – Building A, Sector 2 with the attached Sheet A101.A2 Architectural
1st Floor Plan – Building A, Sector 2
ADDENDUM NUMBER TWO
3
8. Sheet A141.A1 Reflected Ceiling Plan – First Floor – Building A, Sector 1: Replace Sheet
A141.A1 Reflected Ceiling Plan – First Floor – Building A, Sector 1 with the attached Sheet
A141.A1 Reflected Ceiling Plan – First Floor – Building A, Sector 1.
9. Sheet A141.A2 Reflected Ceiling Plan – First Floor – Building A, Sector 2: Replace Sheet
A141.A2 Reflected Ceiling Plan – First Floor – Building A, Sector 2 with the attached Sheet
A141.A2 Reflected Ceiling Plan – First Floor – Building A, Sector 2.
10. Sheet A141.B Reflected Ceiling Plan – First Floor – Building B: Replace Sheet A141.B Reflected
Ceiling Plan – First Floor – Building B with the attached Sheet A141.B Reflected Ceiling Plan –
First Floor – Building B.
11. Sheet A141.C Reflected Ceiling Plan – First Floor – Building C: Replace Sheet A141.C Reflected
Ceiling Plan – First Floor – Building C with the attached Sheet A141.C Reflected Ceiling Plan –
First Floor – Building C
12. Sheet A141.D Reflected Ceiling Plan – First Floor – Building D: Replace Sheet A141.D Reflected
Ceiling Plan – First Floor – Building D with the attached Sheet A141.D Reflected Ceiling Plan –
First Floor – Building D
13. Sheet A141.F Reflected Ceiling Plan – First Floor – Building F: Replace Sheet A141.F Reflected
Ceiling Plan – First Floor – Building F with the attached Sheet A141.F Reflected Ceiling Plan –
First Floor – Building F
14. Sheet A142.A1 Reflected Ceiling Plan – Second Floor – Building A Sector 1: Replace Sheet
A142.A1 Reflected Ceiling Plan – Second Floor – Building A Sector 1 with the attached Sheet
A142.A1 Reflected Ceiling Plan – Second Floor – Building A Sector 1.
15. Sheet A142.A2 Reflected Ceiling Plan – Second Floor – Building A Sector 2: Replace Sheet
A142.A2 Reflected Ceiling Plan – Second Floor – Building A Sector 2 with the attached Sheet
A142.A2 Reflected Ceiling Plan – Second Floor – Building A Sector 2.
16. Sheet A142.C Reflected Ceiling Plan – Second Floor – Building C: Replace Sheet A142.C
Reflected Ceiling Plan – Second Floor – Building C with the attached Sheet A142.C Reflected
Ceiling Plan – Second Floor – Building C.
17. Sheet A151 Overall Roof Plan: Replace Sheet A151 Overall Roof Plan with the attached Sheet
A151 Overall Roof Plan.
18. Sheet A151.C Roof Plan – Building C: Replace Sheet A151.C Roof Plan – Building C with the
attached Sheet A151.C Roof Plan – Building C.
19. Sheet A151.D Roof Plan – Building D & E: Replace Sheet A151.D Roof Plan – Building D & E
with the attached Sheet A151.D Roof Plan – Building D & E.
20. Sheet A151.F Roof Plan – Building F: Replace Sheet A151.F Roof Plan – Building F with the
attached Sheet A151.F Roof Plan – Building F.
21. Sheet A201 Building Elevations: Replace Sheet A201 Building Elevations with the attached
Sheet A201 Building Elevations.
22. Sheet A202 Building Elevations: Replace Sheet A202 Building Elevations with the attached
Sheet A202 Building Elevations.
23. Sheet A203 Building Elevations: Replace Sheet A203 Building Elevations with the attached
Sheet A203 Building Elevations.
ADDENDUM NUMBER TWO
4
24. Sheet A204 Building Elevations: Replace Sheet A204 Building Elevations with the attached
Sheet A204 Building Elevations.
25. Add Sheet A206 Building Elevations.
SPECIFICATIONS
1. Section 00 0007 Bid Form: Replace Specification Section 00 0007 Bid Form with the attached
Specification Section 00 0007 Bid Form.
2. Section 01 2200 Unit Prices: Replace Specification Section 01 2200 Unit Prices with the
attached Specification Section 01 2200 Unit Prices.
3. Add the attached Specification Section 08 7100 Door Hardware.
4. Section 10 7500 Flagpoles: Delete Specification Section 10 7500 Flagpoles.
5. Section 09 9000 Painting and Coating: Add the attached Specification Section 09 9000 Painting
and Coating.
PRIOR APPROVALS – NOT APPROVED:
The following items were submitted as prior approval requests and were NOT approved.
Manufacturer
CertainTeed
CertainTeed
Eastern Metal Supply
Elevate
Product
Acoustical Ceiling Grid System
Fine Fissured Customline Acoustical Ceiling Tile
Walkway Canopy System
SBS Roofing System
STRUCTURAL
DRAWINGS
1. Sheet S101R Building C & D Roof Plan: Replace Sheet S101 Building C & D Roof Plan with the
attached Sheet S101R Building C & D Roof Plan
MECHANICAL
DRAWINGS
1. Sheet M101b Mechanical Floor Plan – First Floor & Roof – Building B: Replace Sheet M101b
Mechanical Floor Plan – First Floor & Roof – Building B with the attached Sheet M101b
Mechanical Floor Plan – First Floor & Roof – Building B.
2. Sheet M101c Mechanical Floor Plan – First Floor – Building C: Replace Sheet M101c
Mechanical Floor Plan – First Floor – Building C with the attached Sheet M101c Mechanical Floor
Plan – First Floor – Building C.
3. Sheet M101d Mechanical Floor Plan – First Floor – Building D & E: Replace Sheet M101d
Mechanical Floor Plan – First Floor – Building D & E with the attached Sheet M101d Mechanical
Floor Plan – First Floor – Building D & E.
ADDENDUM NUMBER TWO
5
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >