J056--BSL3 HVAC Controls Replacement - Sol
Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
---|---|
State: | Federal |
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159207072941411 |
Posted Date: | Apr 23, 2024 |
Due Date: | Apr 29, 2024 |
Solicitation No: | 36C25724Q0384 |
Source: | Members Only |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- All Dates/Times are: (UTC-05:00) CENTRAL STANDARD TIME, CHICAGO, USA
- Updated Published Date: Apr 23, 2024 01:15 pm CDT
- Original Published Date: Mar 21, 2024 11:23 am CDT
- Updated Date Offers Due: Apr 29, 2024 01:00 pm CDT
- Original Date Offers Due: Apr 16, 2024 01:00 pm CDT
- Inactive Policy: Manual
- Updated Inactive Date: May 29, 2024
- Original Inactive Date: Apr 26, 2024
-
Initiative:
- None
- Original Set Aside:
- Product Service Code:
-
NAICS Code:
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Amendment #2 Q&A#47 stated The contractor will need to replace the electrical between windows. It was our understanding from the site visit that instead of removing and reinstalling data comm and electrical power between windows, these items are to remain and the inner window assembly on either side is to be removed and replaced with metal stud walls, rock wool insulation and gypsum board (per Am#2 Q&A#26). Please confirm.
Â
The data drop and the electrical power will need to be relocated from the wall.Â
We understand amendment #2 file BSL-3+LAB+REPAIRS+DRAWING+and+SPECS is an as-built drawing provided for reference. If this is not correct, please clarify otherwise by amendment.Â
The drawing attached in the amendment #2 is for reference. Â
Statement of work paragraph 2.c states to provide a new i2920 controller. If the contractor is required to provide 120V power to the new controller, please indicate panel and panel location it is to come from.Â
Existing powerÂ
Approximate square footage of the BSL3 laboratoryÂ
See attached floor plan. Square footage is in magenta.Â
Specific types of HVAC controls requiring replacement
Â
Intech questionÂ
Since HVAC technicians typically lack the qualifications and authorization for this specialized work, would the BMBL Certification need to be quoted separately? Â
     Â
              NoÂ
Is ENV Services, the only company that can perform the certification?Â
             YesÂ
 Do we need to include their pricing in our proposal?Â
             YesÂ
Â
- 5441 Babcock Road Suite 302
- San Antonio , TX 78240
- USA
- Jose P Portalatinrivera
- jose.portalatinrivera@va.gov
Related Document
Mar 21, 2024 | [Presolicitation (Original)] J056--BSL3 HVAC Controls Replacement - Sol |
Mar 21, 2024 | [Solicitation (Original)] J056--BSL3 HVAC Controls Replacement - Sol |
Apr 2, 2024 | [Solicitation (Updated)] J056--BSL3 HVAC Controls Replacement - Sol |
Apr 10, 2024 | [Solicitation (Updated)] J056--BSL3 HVAC Controls Replacement - Sol |
Apr 26, 2024 | [Solicitation (Updated)] J056--BSL3 HVAC Controls Replacement - Sol |
Apr 30, 2024 | [Solicitation (Updated)] J056--BSL3 HVAC Controls Replacement - Sol |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.