J056--BSL3 HVAC Controls Replacement - Sol

Agency: VETERANS AFFAIRS, DEPARTMENT OF
State: Federal
Level of Government: Federal
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Opps ID: NBD00159810051847227
Posted Date: Apr 26, 2024
Due Date: May 1, 2024
Solicitation No: 36C25724Q0384
Source: Members Only
Follow
J056--BSL3 HVAC Controls Replacement - Sol
Active
Contract Opportunity
Notice ID
36C25724Q0384
Related Notice
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
257-NETWORK CONTRACT OFFICE 17 (36C257)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Solicitation (Updated)
  • All Dates/Times are: (UTC-05:00) CENTRAL STANDARD TIME, CHICAGO, USA
  • Updated Published Date: Apr 26, 2024 01:45 pm CDT
  • Original Published Date: Mar 21, 2024 11:23 am CDT
  • Updated Date Offers Due: May 01, 2024 01:00 pm CDT
  • Original Date Offers Due: Apr 16, 2024 01:00 pm CDT
  • Inactive Policy: Manual
  • Updated Inactive Date: May 31, 2024
  • Original Inactive Date: Apr 26, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: J056 - MAINT/REPAIR/REBUILD OF EQUIPMENT- CONSTRUCTION AND BUILDING MATERIALS
  • NAICS Code:
    • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
  • Place of Performance:
Description
3rd RFI s
Amendment #3 indicates the data drops and electrical power will need to be relocated from the wall. Please identify the new locations for these services so that this work can be priced.

Answer: There will be no relocations or no new locations. Electrical components will be removed and re-installed in same location as needed.

Amendment #2 issued photographs that show furniture, computers, desktop microscopes, cleaning supplies, stacked boxes, loose items, etc. Please confirm the VA will remove all these items before construction.
Answer: VA will clean up before project starts/ Lab personal.
Updated sequence of operations has not been provided per Am#2 Q&A#19. Please provide a designed sequence of operations that contractors can implement and test.
Answer: Entech will provide sequence plus program as well.
Please provide a material specification for the new duct insulation including thickness.
Answer: 3 thickness
We understand the ceiling to be replaced is gypsum board and paint. If not correct, please clarify otherwise by amendment.
Answer: Yes sheetrock and paint.
Statement of Work paragraph 2.j. states Contractor shall make any repairs necessary for the BSL-3 Lab to pass certification. Repairs shall include but not be limited to: Replacement of ceiling; Replacement of Duct Insulation; Replacement of Insulation around Windows and Enclosing Window.Â
Answer: Program sequence of operation to pass Certification.
Contractors cannot know which portions of the existing BSL3 lab do not comply until the certification test is performed. Please confirm that any work not required specifically by the statement of work will be handled as a modification to the contract.

Answer: Air Handler and Exhaust fan all in place just need to program sequence of operation.
Attachments/Links
Contact Information
Contracting Office Address
  • 5441 Babcock Road Suite 302
  • San Antonio , TX 78240
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Mar 21, 2024[Presolicitation (Original)] J056--BSL3 HVAC Controls Replacement - Sol
Mar 21, 2024[Solicitation (Original)] J056--BSL3 HVAC Controls Replacement - Sol
Apr 2, 2024[Solicitation (Updated)] J056--BSL3 HVAC Controls Replacement - Sol
Apr 10, 2024[Solicitation (Updated)] J056--BSL3 HVAC Controls Replacement - Sol
Apr 23, 2024[Solicitation (Updated)] J056--BSL3 HVAC Controls Replacement - Sol
Apr 30, 2024[Solicitation (Updated)] J056--BSL3 HVAC Controls Replacement - Sol

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >