Cibola National Forest Concrete Pad at USFS Clayton, NM Administrative Site
Agency: | AGRICULTURE, DEPARTMENT OF |
---|---|
State: | New Mexico |
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159987922499001 |
Posted Date: | Sep 12, 2023 |
Due Date: | Sep 20, 2023 |
Solicitation No: | 127EAX23Q0094 |
Source: | Members Only |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- All Dates/Times are: (UTC-06:00) MOUNTAIN STANDARD TIME, DENVER, USA
- Updated Published Date: Sep 12, 2023 03:41 pm MDT
- Original Published Date: Sep 08, 2023 03:22 pm MDT
- Updated Date Offers Due: Sep 20, 2023 05:00 pm MDT
- Original Date Offers Due: Sep 20, 2023 05:00 pm MDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Oct 05, 2023
- Original Inactive Date: Oct 05, 2023
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 5440 - SCAFFOLDING EQUIPMENT AND CONCRETE FORMS
-
NAICS Code:
- 238110 - Poured Concrete Foundation and Structure Contractors
-
Place of Performance:
Clayton , NM 88415USA
The Contractor will prepare the site including grading and dirt work, install a 30' X 30' X 6" deep, 3000 psi concrete slab
with fiberglass mixed into concrete, and a 6” wide X 2’ deep continuous footing with rebar. The exact location will be
discussed with USFS personnel; see site map. Contractor will install concrete forms (2X6 lumber/steel forms) and make
sure the pad will be square. Contractor will supply all materials to install the forms and any other tools needed to pour
concrete. Rebar will not be utilized in the floor since fiberglass will be mixed with the Concrete. Concrete will be hauled
locally at 3 miles one way (5 min drive). Bull float will be used to get a rough finish on concrete. No vibration equipment
will be used. A 10 day advance notice prior to starting concrete work to allow for time to prep for the concrete pad.
- 333 Broadway BLVD SE
- Albuquerque , NM 871023498
- USA
- Anthony R. Love II
- anthony.love@usda.gov
- Phone Number 410-231-6069
- Sep 12, 2023 03:41 pm MDTCombined Synopsis/Solicitation (Updated)
- Sep 08, 2023 03:22 pm MDT Combined Synopsis/Solicitation (Original)
Related Document
Sep 8, 2023 | [Combined Synopsis/Solicitation (Original)] Cibola National Forest Concrete Pad at USFS Clayton, NM Administrative Site |
Sep 14, 2023 | [Combined Synopsis/Solicitation (Updated)] Cibola National Forest Concrete Pad at USFS Clayton, NM Administrative Site |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.